EEMC Cal Run9-07-29-2014

 Preliminary Pre&PostShower analysis:

Using the SMD I get before, as well as the ideal tower gain, I try to calibrate the pre & post shower with SMD & Tower cuts.

SMD cuts: thrMipSmdE=0.4/1000.   emptyStripCount=10    offCenter=0.8
Tower cuts: twMipRelEneLow=0.5, twMipRelEneHigh=2.

Compare the gain to 2006 final pre&postshower gains:





===========================================================================================================================
The bad fitting or bad spectrum from the pre&postshower list below:

05PA01-valL
05PE01-valL
05PA02-valL
05PE02-valL
05PA03-valL
05PE03-valL
11PD03-valL
05PB10-valL
05PC10-valL
05PD10-valL
11PE10-valL
02PA11-mask
05PB11-valL
05PC11-valL
05PD11-valL
05PB12-valL
05PC12-valL
05PD12-valL
11PE12-valL

11QB04-valL
11QE10-sigL
11QE12-valL

03RC09-valL
11RE10-valL
01RD11-valL
03RC12-valL
10RD12-valL
11RE12-valL
==============================================================================================================