EEMC Cal Run9-09-12-2014
Use the gains and mask files get before, set full cuts:
SMD cuts & mipT cuts as before;
adc cuts on pre&postshower from 6 to 106
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Bad fitting list:
05PA01-valL
05PE01-valL
05PA02-valL
05PE02-valL
05PA03-valL
05PE03-valL
11PD03-valL
05PB10-valL
05PC10-valL
05PD10-valL
11PE10-valL
02PA11-mask
05PB11-valL
05PC11-valL
05PD11-valL
05PB12-valL
05PC12-valL
05PD12-valL
11PE12-valL
11QE10-valL
11QE12-valL
11RE10-valL
11RE12-sigL
Check individual spectrum in directory: http://www.star.bnl.gov/protected/spin/tinglin/summber2014/ps_iter37/
========================================================================================================
There are shifts in the pre1 & pre2 shower gains. Gains from full cuts are smaller than that from tower cuts.
I plot the distribution of these two gains' ratio:
:
=======================================================================================
- tinglin's blog
- Login or register to post comments