BTOW Timing Curves: U+U 2012
I determined the timing change between p+p running and U+U running.
These curves represent the integral of the ADC spectrum from 100<ADC-PED<350.
The greem line is the result of the gaussian fit to the region 99-131 ns and the red line is
the nominal value of 119 determined in the p+p running.
runs={13116084,13116065,13116067,13116068,13116075,13116069,13116080,13116081,13116082,13116083}
delays(ns)={100,105,110,115,120,119,125,130,135,140,145}
Conclusions: Optimum delay has moved by -4 ns (+/-1ns),
from 119 ns to 115 ns
Groups:
- trent's blog
- Login or register to post comments