TPC summary for run19

 Following the run-19 there are are a number of actions that has to be done ahead of RUN-20
This is summarized in the first document below

The second item is that it is possible we have excessive auto recoveries for the low energy run relative
to comparisons with previous running, and should look more into this. The current status is outlined in the
second document.