- xuanli's home page
- Posts
- 2015
- 2014
- 2013
- December (4)
- November (2)
- October (6)
- September (4)
- August (6)
- July (4)
- June (4)
- May (4)
- April (3)
- March (15)
- February (6)
- January (5)
- 2012
- December (3)
- November (10)
- October (9)
- September (4)
- August (5)
- July (11)
- June (3)
- May (1)
- April (1)
- March (1)
- January (2)
- 2011
- December (3)
- October (4)
- September (3)
- August (3)
- July (2)
- June (6)
- May (13)
- April (7)
- March (10)
- February (2)
- January (1)
- 2010
- 2009
- My blog
- Post new blog entry
- All blogs
ESMD run08 pedestal staltus check
With the run list of run08 pp data. I checked the pedestal run dependence for several ESMD stips.
Fig1, U panel sector 2 strip 1.
Fig 2, V panel sector 2 strip 1.
Fig 3, U panel sector 4 strip 1.
Fig 4, V panel sector 4 strip 1.
The pedestals read from the histogram maximum bin center is stable for this strip, but the pedestal got from (raw ADC - pedestal subtracted ADC) is shifted by one ADC count in some runs. So I take 2 runs which see the pedestal shift and compare the distributions of the 2 runs.
Fig5, the raw ADC distribution.
Fig 6, the pedestal got from the ( raw ADC - pedestal subtracted ADC).
Groups:
- xuanli's blog
- Login or register to post comments