FGT assembly status - 20120713

Preparation for assembly new FGT quardrants:

(1) Test of the single foil. Done.

(2) Frames are ready.

 

Assembly of the FGT quardrants:

(1) Two quardrants of Bottom PV layer, HV layer and first GEM layer are glued.

(2) HV test of one quardrant is ongoing. Expect to glue a second GEM layer on one quardrant after the HV test is finished.