FGT assembly status -20120726

As we do not have access to the clean room from Jul. 23 to Jul. 25. We just start the current leakage test for the GEM foils with frame and no soldered pins, GEM foils with frames and soldered pins on Jul.26. In addition to the current leakage measurements, we have capicity measurement for each GEM foil sector as well to see whether each pin is connected to its relevant sector. Current test shows good connections for FGT quardant 25, 26 and all GEM foils with soldered pins.