FNAL-BNL Statement of Work 

Drawings provided to Fermilab 2019-9-15, 2019-11-04

Drawings provided by Fermilab (2019-11-06, 2019-11-06, 2019-12-10, 2019-12-16, 2019-12-16): 1, 2, 3, 4, 5

Fermilab confirmation of receiving epoxies packing slip

Fermilab Meeting 2019-9-19

CMM measurements of the assembly fixture parts and preliminary assembly procedure 2020-2-7

Assembly Document v7 (Feb2020)

Comments on the production module MS 2020-11-09