Forward Silicon Tracker - Module Assembly
Updated on Mon, 2020-11-09 16:56. Originally created by yezhenyu on 2019-09-24 17:40.
FNAL-BNL Statement of Work
Drawings provided to Fermilab 2019-9-15, 2019-11-04
Drawings provided by Fermilab (2019-11-06, 2019-11-06, 2019-12-10, 2019-12-16, 2019-12-16): 1, 2, 3, 4, 5
Fermilab confirmation of receiving epoxies packing slip
Fermilab Meeting 2019-9-19
CMM measurements of the assembly fixture parts and preliminary assembly procedure 2020-2-7
Assembly Document v7 (Feb2020)
Comments on the production module MS 2020-11-09
»