HF PWG Meeting Minutes by Zhenyu - 2017/3/2

1) D0 v1 from Run14 Au+Au - Subhash/Nasim
used costheta>0.97 (D0 v2 used costheta>0) in D0 tree production. Should not affect the signal since most D0 have costheta0.95, will change later

no pT cut on D0 or efficiency correction for D0 reconstruction -> should apply a miniumum pT cut, and correct for pT-dependent D0 efficiency correction

will do pi+/- as a cross-check

Sooraj also showed current status on D0 v1 from Run16 Au+Au. cuts mostly the same, but has a minimum D0 pT>1.5 GeV/c cut