- yezhenyu's home page
- Posts
- 2022
- April (1)
- 2021
- August (1)
- 2020
- 2019
- 2018
- 2017
- November (2)
- September (2)
- August (4)
- July (2)
- June (3)
- May (2)
- April (3)
- March (2)
- February (2)
- January (10)
- 2016
- December (3)
- November (2)
- October (2)
- September (3)
- August (3)
- July (1)
- June (1)
- May (2)
- April (2)
- March (2)
- February (3)
- January (2)
- 2015
- December (2)
- November (6)
- October (1)
- September (5)
- August (3)
- July (6)
- June (1)
- May (7)
- April (3)
- March (1)
- February (7)
- 2014
- My blog
- Post new blog entry
- All blogs
Meeting at UIC 20200219
Updated on Mon, 2020-02-24 16:21. Originally created by yezhenyu on 2020-02-18 14:58.
- Mechanical structure
https://drupal.star.bnl.gov/STAR/event/2020/02/17/fst-group-meeting/mechanical-structure
************2019 ************
- Current schedule
https://drupal.star.bnl.gov/STAR/event/2019/11/19/star-forward-upgrade-meeting-0/forward-silicon-tracker-status
- Plan for integration in the fall
https://drupal.star.bnl.gov/STAR/system/files/February_19_2020_intro.pdf
- Requirements document
- Test stands
- Xu Sun: https://drupal.star.bnl.gov/STAR/system/files/FST_TestStand_Discussion.pdf
- Andres Aguilar: https://drupal.star.bnl.gov/STAR/system/files/STAR%20Presentation.pdf
- Yu Hu: https://drupal.star.bnl.gov/STAR/system/files/status_of_IST_testing_stander_at_bnl_18Feb2020_UIC.pdf
- Mechanical structure
https://drupal.star.bnl.gov/STAR/event/2020/02/17/fst-group-meeting/mechanical-structure
************2019 ************
- End March EASTON produced three mechanical structure, with visible bending issue
- Early July NCKU completed a new design with different materials and thickness, and flexibility of air vs liquid cooling
- Mid Aug NCKU signed the contract with EASTON to produce mechanical-structure
- End Aug NCKU was asked to find out from EASTON and AIDC the tolerances they can achieve in mechanical structure and mounting hybrids
- Mid Sep The tolerance for Hybrid fabrication is 200 microns, and mechanical structure dimension 150 microns. EASTON on surface flatness: "it is mostly determined by the mold and they have confident to make it flat. But they need to see the actual product.".
- Mid Oct EASTON made the 1st prototypes but with visible bending. Going to add a rib and increase number of injection points.
- Nov 4 NCKU Received the 1st prototypes from EASTON. Going to further increase the injection point
- Nov 19 NCKU received the 2nd batch PEEK+30%GF with visible bending, Going to split the mold and inject from the center,
- Dec 10 NCKU received the 3rd batch using better flow PEEK+30%CF and removed center. See improvement than the previous batch but still measured with 500-700 micron bending. Going to increase the thickness from 1.5 to 2mm
- Dec 20 NCKU received the 4th batch with pure PEEK and 2mm thickness.
- Jan 6 AIDC measured the 4th batch: Inner and Outer 100-150 micron. AIDC will remove the center of the outer and remeasure
- Jan 20 EASTON will try to improve the flatness by heating the structure. May be able to achieve 150 microns or better
- Jan 30 AIDC assembled and measured the 1st prototype. Maximum deviation: Inner 150 micron Outer 270 microns
- Feb 7 AIDC assembled the 2nd prototype.
- Feb 14 Yi measured at NTU, RMS of 1st prototype: 290 micron Inner, 465 outer, 2nd prototype: 260 inner and outer. Will try to determine the maximum deviation from a flat surface
- Feb 18 Yi: "will ask EASTON if this can be improved by making a new mold, or I will find another company to do it"
- Current schedule
https://drupal.star.bnl.gov/STAR/event/2019/11/19/star-forward-upgrade-meeting-0/forward-silicon-tracker-status
- Plan for integration in the fall
https://drupal.star.bnl.gov/STAR/system/files/February_19_2020_intro.pdf
- Requirements document
»