- yezhenyu's home page
- Posts
- 2022
- April (1)
- 2021
- August (1)
- 2020
- 2019
- 2018
- 2017
- November (2)
- September (2)
- August (4)
- July (2)
- June (3)
- May (2)
- April (3)
- March (2)
- February (2)
- January (10)
- 2016
- December (3)
- November (2)
- October (2)
- September (3)
- August (3)
- July (1)
- June (1)
- May (2)
- April (2)
- March (2)
- February (3)
- January (2)
- 2015
- December (2)
- November (6)
- October (1)
- September (5)
- August (3)
- July (6)
- June (1)
- May (7)
- April (3)
- March (1)
- February (7)
- 2014
- My blog
- Post new blog entry
- All blogs
NPE in Run14 Au+Au 200 GeV Meeting Minutes by Zhenyu - 2016/9/20
Updated on Mon, 2016-09-26 10:58. Originally created by yezhenyu on 2016-09-26 10:58.
1) NPE updates by Kunsu
slide 5: the discrepancy could be due to the assumed PHE efficiency of 0.5 is too large. In Shenghui's Run14 no-HFT study, she got 0.1-0.3 for 1.5<pT<4 GeV/c
slide 6: the level of data-Hijing agreement shown in the figure on the left is worse than what Kunsu showed at the collaboration meeting. Possible reasons could be due to 1) different pT range 2) including too much direct photon
slide 9: no obvious reason for this 10 micron shift
2) update by Xiazohi
obtained B->e fraction from MB and HT data as well, using TMinuit to fit data to tempaltes.
Hijing Simulation
100k Events for test production with MB (0-15fm), |Vz| < 6cm (Full production will be 1M, it will be decided later.)
2. Output file : TPC MuDst
3. Embedding particle :
1. Gamma 500/event (flat 0 < pT < 20, flat -1 < y < 1)
2. Pi0 100/event 90% 2gamma 10% Dalitz decay (flat 0 < pT < 30, flat -1 < y < 1)
3. Eta 100/event 90% 2gamma 10% Dalitz decay (flat 0 < pT < 30, flat -1 < y < 1)
4. electron 5/event (flat 0 < pT < 10, flat -1 < y < 1)
5. positron 5/event (flat 0 < pT < 10, flat -1 < y < 1)
6. pion+ 1/event (flat 0 < pT < 10, flat -1 < y < 1)
7. pion- 1/event (flat 0 < pT < 10, flat -1 < y < 1)
9. D0 1/event semi-leptonic decay (flat 0 < pT < 20, flat -1 < y < 1)
10. D0bar 1/event semi-leptonic decay (flat 0 < pT < 20, flat -1 < y < 1)
4. Production library : SL16d
5. Production chain : y2014a,event,tpc,fzin,geantout,tpcrs,TpcHitMover,TpxClu,evout,-HitFilt
6. Resource : 80k[hours] / 100k[events] and 4[TB] / 100k[events]
»