Proton high moments - my collections [BES-II]
To store some slides of mine on high moments study from Au+Au collisions of BES phase 2.
log:
> 2023, Mar. 17th: 11.5 updates
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM230317.pdf
> 2023, Mar. 2nd: Collaboration Meeting: framework, 19.6, 14.6 and 9.2
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/CM230302_Yige_CF.pdf
> 2023, Mar. 2nd: Focus Meeting: TOF eff. issue, DCA cut issue, 19.6, 14.6, 9.2 and 11.5
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM230302.pdf
> 2023, Feb. 18th: embedding QA and 19.6 calculations (only statistic errors) (centrality and rapidity dependence)
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM230218.pdf
> 2023, Feb. 15th: Embedding QA (19.6 and 14.6), not a slides but all the comparison plots
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/Yige_Embedding_19and14_QA_20230215.pdf
> 2023, Feb. 4th: some updates, details:
>
> 1) 9.2 GeV fast offline, QA, n sigma shift, centrality and DCA check.
>
> 2) New 19.6 GeV embedding
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM230204.pdf
> 2023, Jan. 19th: efficiency and systematic uncertainty from 7.7 GeV (with fake TPC eff.)
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM230119.pdf
> 2023, Jan. 7th: efficiency (TPC and TOF match) from 7.7 GeV
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM230107.pdf
> 2022, Dec. 15th: a quick report on n sigma cut on <DCAz> and <sDCAxy>.
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM22215.pdf
> 2022, Dec. 8th: PWG for analysis meeting 7.7 status
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/AnalyzeMeeting_221208_yige_ver1.pdf
> 2022, Nov. 17th: further check on <sDCAxy> and <DCAz> cut (based on Ashish's results and comparsion.
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM221117.pdf
> 2022, Oct. 27th: focus on low proton number issue (and <DCA> cut)
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM221027.pdf
> 2022, Oct. 22nd: Check the <DCA> and <DCAxy> for bad events. check the pT & y dep. n sigma shift.
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM221022.pdf
> 2022, Oct. 15th: Big updates on 7.7 GeV: n sigma shift methods, purity and PID, proton number issue
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM221015.pdf
> 2022, Sept. 15th: Further checks on 7.7 GeV
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM220915_fix.pdf
> 2022, Sept. 3rd: 7.7 GeV addtional information
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM220903.pdf
> 2022, Sept. 1st: 7.7 GeV using 19.6 eff.
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM220901.pdf
> 2022, Aug. 18th: 19.6 for PWG
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/PWG_yige_220818.pdf
> 2022, Aug. 18th: 19.6 rapidity dependence
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM220818.pdf
> 2022, Aug. 11th: 19.6 urqmd with more details, there are some animations so .pptx file is needed.
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM220811.pdf
>>
>> And https://drupal.star.bnl.gov/STAR/system/files/HM220811.pptx
> 2022, Aug. 4th: 19.6 GeV urqmd
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM220804.pdf
> 2022, June 18th: 7.7 GeV bTOF and nsigma check
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM220618.pdf
> 2022, June 11th: final results for 19.6 GeV [3/3] (centrality dependence, traditional rapidity dependence, binning in rapidity dependence), now be lacking of UrQMD results.
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM220611.pdf
> 2022, May 28th: final results for 19.6 GeV [2/3] (centrality dependence, traditional rapidity dependence)
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM220528.pdf
> 2022, May 19th: (traditional) efficiency dependence of 19.6 GeV, (in Thursday high moments focus meeting)
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM220519_0.pdf
> 2022, May 14th: efficiency stuff on 19.6 GeV
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM220519.pdf, (in Saturday high moments meeting)
> 2022, May 12th: traditional rapidity dependence on 19.6 GeV, only one figure
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/fig_netp_cum.pdf
> 2022, Apr. 28th: Systematic errors for 19.6 GeV
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HoM220428.pdf
>
>> Also, there is another version for PWG meeting: https://drupal.star.bnl.gov/STAR/system/files/Yige_CF_PWG_220428.pdf
> 2022, Apr. 23rd: Affects of parameters in Glauber + NBD fit, and new definition of 19.6, and cumulants
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HoM220423.pdf
> 2022, Apr. 16th: 19.6 GeV cumulants (with correct efficiency) and 14.6 GeV using efficiency from 19.6.
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HoM220416.pdf
> 2022, Apr. 9th: 19.6 GeV cumulants with fixed rapidity window.
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HM220409.pdf
> 2022, Mar. 24th: 19.6 GeV eff. corrected cumulants and CFs.
>
>> Link: https://drupal.star.bnl.gov/STAR/system/files/HoM220324.pdf
- yghuang's blog
- Login or register to post comments