QA 11.5 GeV (run20) updates

Feb 26 2024 QA run log assessment: https://drupal.star.bnl.gov/STAR/system/files/11.5GeV_runlog_accessment_check_v1.pdf

Jan 12 2024 QA algorithm study: https://drupal.star.bnl.gov/STAR/system/files/11.5_GeV_QAboard_Zhiwan_v7.pdf

Mar 5 2024 Centrality: https://drupal.star.bnl.gov/STAR/system/files/11.5_GeV_centrality_Zhiwan_official.pdf



------previous updates ------

Feb 6 2024 Centrality

 

Jan 16 2024 Centrality

 


Jan 08 2024 Centralitty:

 

Jan 02 2024 Centrality:

 

-----Updates in 2023---------------------------------------------------

Dec 19 Centrality:
https://drupal.star.bnl.gov/STAR/system/files/11.5_GeV_centrality_Zhiwan_v3.pdf

Planned for Dec 19 QA board:

 


Dec 08 QA board:

 

Dec 05 Centrality group:

 

Nov 03 QA board: 
https://drupal.star.bnl.gov/STAR/system/files/11.5_GeV_QAboard_Zhiwan_v3.pdf

Oct 30 centrality group:
https://drupal.star.bnl.gov/STAR/system/files/11.5_GeV_QA_Zhiwan_v2.pdf

Oct 27 QA board:
https://drupal.star.bnl.gov/STAR/system/files/11.5_GeV_QA_Zhiwan_v1.pdf