FST Operation Log - Mid April 2023

April 18 - May 09 2023 Log





 April 17 2023

1. The wieners are relocated into the cabinet which also stores the spare FST modules: (boxes are under the table against the cabinet door)
 
2. FST cooling system is manually started from the rack.
3. The current limit while ramping up the voltage is successfully changed from 50 muA to 100 muA
4. Trivial: turn off the FST, MPOD crates, shut off the cooling system

========================================================================================

April 15 2023

1. The coolant is refilled to 95% (later on it dropped back to 85%)
2. The current limit is changed form 50 muA to 100 muA on the slow control (code compiled), but not tested due to power shut down

The winter 2023 log