fisyak's blog - Revision of STAR TPC dE/dx model (rev2) - January 4., 2023
- Run XIX – XXII dE/dx calibration(check point) - December 13., 2022
- Run XIX – XXII dE/dx calibration(check point) - December 13., 2022
- TPC online and offline clusters (Update) - October 20., 2022
- Comparison 7p7GeV_2021 from TFG21c.B, 21_DEV_calib, and P22ib - August 17., 2022
- Revision of STAR TPC dE/dx model - July 20., 2022
- Results of 7p7GeV 2021 dE/dx calibration using TFG release - May 25., 2022
- Diffusions and drift velocity garfield++ calculations for P10 and Ar+CH4+CF4 gas mixtures with more detailed steps in CF4 % - February 28., 2022
- Run XIX dead/alive FEE/ RDO summary - February 4., 2022
- TpcRS update due to 19GeV 2019(RDO mask, padGainT0, and Gating Grid) - January 18., 2022
- Run XXII TPC t0 from prompt hits (some oddities) - January 10., 2022
- Run XXII T0 from day 349 - December 15., 2021
- dE/dx problem with BES-II data - December 15., 2021
- dE/dx calibration of Run XIX and XX fixed Target (progress report) - October 20., 2021
- Background studies at ATHENA - October 18., 2021
- Missing high dE/dx in Run 21 3p85 GeV fixed target data with respect to Run 18 one. - September 26., 2021
- Problems with dE/dx pulls in P21ib_calib2 and P21ic production - August 18., 2021
- Status of the express production of Run XXI - August 4., 2021
- dE/dx from express production 3p85GeV_fixedTarget 2021 - June 23., 2021
- Correlation between the STAR main magnet current and Ks0 mass for 2021 7p7 GeV and 17p3 GeV data - June 17., 2021
- OO 200 GeV 2021 RF vs FF - June 9., 2021
- Run XIX 19 GeV and 14p5 GeV dE/dx calibration status - May 12., 2021
- 2nd round with Run XIX calibration production for 19GeV and 14p5GeV samples - April 28., 2021
- Averaged STAR magnet current table - April 28., 2021
- Run XIX trigger T0 - March 11., 2021
|