This will be a page that aggregates information for calibrating the EPD.
Welcome to the EPD calibration page. From here, you can:
Sections generally provide links to more detailed information.
---------------------------------------------------------------------------------------------
Calibration Status
Done:
production_3p85GeV_fixedTarget_2019 | 3 | 2019 | FXT | 5 | https://drupal.star.bnl.gov/STAR/blog/eloyd/EPD-Calibration-Run-19-385GeV-FXT-dataset |
1. Generate picos
|
|
production_4p59GeV_fixedTarget_2019 | 3.2 | 2019 | FXT | 5 | 2. Fit all days | ||
production_7.3GeV_fixedTarget_2019 | 3.9 | 2019 | FXT | 5 | https://drupal.star.bnl.gov/STAR/blog/cracz/run-19-epd-calibrations-73-gev-fxt |
3. Troubleshoot problem tiles
|
|
production_31GeV_fixedTarget_2019 | 7.7 | 2019 | FXT | 5 | https://drupal.star.bnl.gov/STAR/blog/eloyd/EPD-Calibration-Run-19-31GeV-FXT-dataset |
4. Enter values into database
|
|
production_7p7GeV_2019 | 7.7 | 2019 | COL | 5 | |||
production_14p5GeV_2019 | 14.5 | 2019 | COL | 5 | |||
production_19GeV_2019 | 19 | 2019 | COL | 5 | |||
production_AuAu200_2019 | 200 | 2019 | COL | 1 | |||
production_5p75GeV_fixedTarget_2020 | 3.5 | 2020 | FXT | 5 | |||
production_7p3GeV_fixedTarget_2020 | 3.9 | 2020 | FXT | 5 | |||
production_9p8GeV_fixedTarget_2020 | 4.5 | 2020 | FXT | 5 | |||
production_13p5GeV_fixedTarget_2020 | 5.2 | 2020 | FXT | 5 | https://drupal.star.bnl.gov/STAR/blog/eloyd/EPD-Calibration-Run-20-13p5GeV-FXT-dataset | ||
production_19p5GeV_fixedTarget_2020 | 6.2 | 2020 | FXT | 5 | https://drupal.star.bnl.gov/STAR/blog/eloyd/EPD-Calibration-Run-20-19p5GeV-FXT-dataset | ||
production_26p5GeV_fixedTarget_2020 | 7.2 | 2020 | FXT | 5 | https://drupal.star.bnl.gov/STAR/blog/eloyd/EPD-Calibration-Run-20-26p5GeV-FXT-dataset | ||
production_31p2GeV_fixedTarget_2020 | 7.7 | 2020 | FXT | 5 | |||
production_11p5GeV_2020 | 11.5 | 2020 | COL | 5 | https://drupal.star.bnl.gov/STAR/blog/dchen/EPD-Calibration-Run20-11p5-GeV-AuAu | ||
2021 "live calibration" | 2021 | 4 | |||||
2022 "calibration" | 2022 | 2 | |||||
production_26p5GeV_fixedTarget_2020 | 7.2 | 2020 | 1 |
This is the current and past calibration status for the various runs in STAR. All runs will also show whether they are complete, in progress, or not yet started.
Run 22 Calibration Status
Run 21 Calibration Status
Run 20 calibrations:
Run 19 calibrations:
Run 18 calibrations:
---------------------------------------------------------------------------------------------
Calibration Process
The basics of calibration can be found here:
https://drupal.star.bnl.gov/STAR/blog/skk317/epd-calibration-isobar-final
Erik's slides on the process of calibration:
https://drupal.star.bnl.gov/STAR/blog/eloyd/EPD-Calibration-Procedure
There will be some updates to this based on more recent code, but this will get you started. Up to date code can be found here:
https://github.com/cdxing/EpdCalibration
https://colab.research.google.com/drive/1a_GEeXxQRDjgFs1E1CUSNY-vjRJYTAKM?usp=sharing