EPD Calibration Run 19

Status of EPD Calibrations for Run 19

Steps to get an energy completed:

  1. Generate picos
  2. Fit all days
  3. Troubleshoot problem tiles
  4. Enter values into database

--------------COMPLETED RUNS------------------
19.6 GeV COL
14.5 GeV COL
7.7 GeV COL
4.59 GeV FXT
https://drupal.star.bnl.gov/STAR/blog/skk317/196-gev-calibration-final-look-numbers
https://drupal.star.bnl.gov/STAR/blog/skk317/epd-calibration-196-gev-run-19-besii


------------INCOMPLETE RUNS----------------------

3.85 GeV FXT

Step 1 complete


7.7 GeV FXT

Step 1 complete


9.2 GeV COL

On step 3

7.3 GeV FXT

Step 1 complete

200 GeV COL