EPD Calibration Run 19
Updated on Thu, 2021-06-10 14:28. Originally created by skk317 on 2020-01-23 11:07.
Status of EPD Calibrations for Run 19
Steps to get an energy completed:
- Generate picos
- Fit all days
- Troubleshoot problem tiles
- Enter values into database
--------------COMPLETED RUNS------------------
19.6 GeV COL
14.5 GeV COL
7.7 GeV COL
4.59 GeV FXT
https://drupal.star.bnl.gov/STAR/blog/skk317/196-gev-calibration-final-look-numbers
https://drupal.star.bnl.gov/STAR/blog/skk317/epd-calibration-196-gev-run-19-besii
------------INCOMPLETE RUNS----------------------
3.85 GeV FXT
Step 1 complete
7.7 GeV FXT
Step 1 complete
9.2 GeV COL
On step 3
7.3 GeV FXT
Step 1 complete
200 GeV COL
Step 1 complete
»