Events
Agenda items
1) Run15: We have a new page for that linked from the subsystem pages
Agenda:
1) BlueJeans meeting
2) run14 production preparation
a) 14.5GeV
b) status of tracking and preparation
- Machine and detector statue (Bill)
- Changes in the trigger/number of ticks (Hank)
- DAQ rates and limits (Jeff)
--- Editorial Board Agenda December 9, 2014 ---
STAR SSD SOFTWARE WORKSHOP - DECEMBER 10, 2014
Agenda:
1) Roman Pot II* status (Wlodek)
2) run15 readiness (Bill)
3) run14 production/readiness (Jerome/Gene)
a) 14.5GeV production
- Machine and detector status (Bill)
--- Agenda ---
1) Run-14 production status
1) News
2) Documentation. Update on masking review/next items to do
3) SSD geometry
4) Tracking and Run15 Db -Hao
Insertion tooling has been completed and arrived at BNL 5/12/2017
A few pictures
Usual SeeVogh bridge
- Phone Bridge
agenda:
1) run15 readiness
a) detector (Bill)
b) computing (Jerome/Gene)
c) shift sign-up (Renee/Jerome)
- EMC Trigger (Will)
- MTD Trigger bits (Rongrong)
- Diffraction trigger update (Igor)
- AOB