Events
0) production priority and readiness (15')
1) CSWP report and implementation plan (10')
2) regular newsletter and/or open forum (10')
--- Agenda ---
Hi , let’s have a meeting tomorrow to touch base on several things
Please note that the meeting room at BNL from now on is 3-191.
1. Run 2015 alignment corrections - Bogdan
- Production priorities for run15.
- Newsletter
- AOB
IST Calibration I - Yaping
1. IstControl and IstGain and kIstTimeBinFrac vector need to revisit these two tables for simulation once the software is in place - Yaping
weekly SSD
SSD calibration tables - Jonathan
SSD calibrations - Long
--- Agenda ---
1) Next steps in Run15 Calibs
- pre-production sample readiness
SRN
ID: 1096183
EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100
- USA (Caltech, Pasadena, CA)
+1 626 395 2112
Agenda:
1) run15 production status and calibration readiness (HFT)
2) run 16 preparation
Agenda
- Run15 Calib progress, including Alignment
- Anything missing from DOE presentation?
- AOB
EVO ID:101 4815
SRN
ID: 1096183
EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100
- USA (Caltech, Pasadena, CA)
+1 626 395 2112
1) run15 production priority and status (25')
FMS+RP streams,
HFT calibration
2) run 16 preparation (15')
- DAQ status/readiness (Jeff)
- Trigger status/readiness (Eleanor/Jack)
--- Agenda ---
1) Ongoing Run-15 pp production: PWG QA
-- Run15 Calibration (+Alignment)
+ HFT-TPC alignment issues
+ PXL masking, IST fixes, SSD tables etc [1-3 slides with brief statements welcome]
Please note that the meeting room at BNL from now on is 3-191.
1. microDST status and plan - Kin
2. microDST QA - Rafal, Lukasz
3. AOB - all
SRN
ID: 1096183
EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100
- USA (Caltech, Pasadena, CA)
1) run15 production [15']
2) run16 readiness (detector, shift sign-up, schedule) [10']
3) BES-I summary paper to NPA [5']