Events
1. PID Analysis Update- Lukasz
2. Info from the Monte Carlo - Bill
3. Paper Proposal Draft Discussion - Chanaka
4. AOB - all
1) Run15 Calibs
- Mustafa/Xin: first look at TPC-HFT alignment in p-p data
- Subsystems updates
Agenda:
1) run preparations
2) eTOF proposal (and internal review)
3) collaboration meeting
1) Calibration pass for run15
2) Remaining tasks before run15 production
— Calibration run15 summary by subsystem
* Remaining items
SRN
ID: 1096183
EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100
0) run preparation and schedule
length of Au+Au vs d+Au
1) collaboration meeting
2) iTPC review
--- Agenda Jan.12, 2016 ---
1. Progress report of the Central Exclusive Production analysis (run 2015) - Rafal
— News from the front: Cosmics [see Xin's email]
SRN
ID: 1096183
EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100
Agenda:
1) run preparation
Shift Certification QA: Prithwish
2) collaboration meeting