Events
1. Analysis e+e- pair production in UPC - Matt
Agenda:
1) run14 production availability
2) run 16 production preparation, status and dE/dx
3) QM abstracts
1. Analysis e+e- pair production in UPC - Matt Rehbein
Agenda:
1) Analysis meeting in November
2) QM2017 rehearsal meeting in February 1-3?
---Run-16 Calibration readiness (includes studies of SSD/PXL hit errors)
Agenda:
1) shut-down schedule and progress
2) preparation for run 17,
FMS+preshower+postshower
1. GEANT 4 simulaiton of Roman Pots - Rafal and Lukasz
Agenda:
1) FMS and postshower status reports (Steve, Oleg and Akio)
2) Analysis meeting Agenda (Frank)
Agenda:
- Oleg, Tonka and Gerard: forward ecal and hcal tchnology solutions nad readout options
SRN ID: 1096183
EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100
- USA (Caltech, Pasadena, CA)
+1 626 395 2112