Events
Agenda:
* Updates from all subsystems, Si, STGC, FCS, Electronics, Slowcontrol, Integration, Trigger, Software All
Agenda:
1. Production status;
2. Electronics status;
3. Integration status;
4. Simulation status;
The agenda is at
https://drupal.star.bnl.gov/STAR/blog/jjiastar/bulkcorr
Meeting Location: BlueaJeans Only
- Update email to the collaboration
- Runs 23 and 25 Au+Au Subcommittee Report (Frank)
This edition of meeting is cancelled, but a few updates are documented below:
1) PicoDst production of 2010 AuAu200_production, AuAu200_production_2011, UU_production_2012
QA experts:
To join the Meeting
https://bluejeans.com/934506067
To join via Room System:
Agenda:
* Page turn for the fSTAR Status Review
Info:
Indigo Page for the Rehearsal https://indico.bnl.gov/event/9189/ PW:fSTARReview2020
We will meet via bluejeans at 10AM EDT
Agenda:
1. Production status;
2. Electronics status;
3. Integration status;
4. Simulation status;
The agenda is at
https://drupal.star.bnl.gov/STAR/blog/jjiastar/bulkcorr
Meeting Location: BlueaJeans Only
- Table of Contents and Page Count
- Section Status Reports
To join the Meeting
https://bluejeans.com/934506067
To join via Room System:
Agenda:
* Review of "final" slides for review
Info:
Agenda:
1. Production status;
2. Electronics status;
3. Integration status;
4. Simulation status;
The agenda is at
https://drupal.star.bnl.gov/STAR/blog/jjiastar/bulkcorr
Meeting Location: BlueaJeans Only
Review page: https://indico.bnl.gov/event/9086/ PW:fSTARReview2020
BJ Connection:
Meeting URL
https://bluejeans.com/815639212?src=join_info
To join the Meeting
https://bluejeans.com/934506067
To join via Room System:
Agenda:
* Recap of the Status Review - See screenshots of closeout slides All
Agenda:
1. Production status;
2. Electronics status;
3. Integration status;
4. Simulation status;
The agenda is at
https://drupal.star.bnl.gov/STAR/blog/jjiastar/bulkcorr
Meeting Location: BlueaJeans Only
https://drupal.star.bnl.gov/STAR/pwg/spin/weekly-pwg-meetings
1) Data production status
- CME group has given green light to Isobar phase-III production, i.e. unblinded full data set. The production team is working on setting it up.
Agenda:
* Shutdown and Installation schedule for 2020 and 2021 Si and sTGC shutdown 2021 planning All
* PAC Talk Elke
Agenda:
1. Production status;
2. Electronics status;
3. Integration status;
4. Simulation status;
The agenda is at
https://drupal.star.bnl.gov/STAR/blog/jjiastar/bulkcorr
Meeting Location: BlueaJeans Only