Events
Agenda:
1. Production status;
2. Electronics status;
3. Integration status;
4. Simulation status;
Agenda:
1. Production status;
2. Electronics status;
3. Integration status;
4. Simulation status;
Zoom Meeting ID: 921 9011 9914
Passcode: 867 854
Minutes:
Tim reported on Gating Grid status
Crate has all modified modules. It was tested locally.
bluejeans link: https://bluejeans.com/208568476/
Agenda:
1. Production status;
2. Electronics status;
3. Integration status;
4. Simulation status;
Agenda:
-hardware status
- software
--- alignment progress
bluejeans link: https://bluejeans.com/208568476/
Landing page for Run-21 QA: https://drupal.star.bnl.gov/STAR/comp/qa/pwg-qa/run-21-bes-ii-qa
STAR Tracking group meeting
Time: Every Monday 11:00 AM Eastern Time (US and Canada)
Agenda:
* Short updates from all subsystems, Si+ Integration, STGC+Integration, Electronics, Software All
Minutes:
Discussion about status of the GMT. The is not simulator so far for the GMT. It seems that fastsim based on hit position smearing should be sufficient.
Agenda:
1. Production status;
2. Electronics status;
3. Integration status;
4. Simulation status;
Zoom Meeting ID: 921 9011 9914
Passcode: 867 854
bluejeans link: https://bluejeans.com/208568476/