Events
https://bnl.zoomgov.com/j/1604529352?pwd=VkdvUEx3RHliN1lGaUR3bVNidWJNQT09
Agenda:
1. Run status
2. S&C
Agenda:
* update of all subsystems, integration, slowcontrol and software All
* sTGC and FCS beam operation
* Alignment
Minutes:
https://bnl.zoomgov.com/j/1604529352?pwd=VkdvUEx3RHliN1lGaUR3bVNidWJNQT09
Agenda:
* update of all subsystems, integration, slowcontrol and software All
* sTGC and FCS beam operation, trigger setting for remaining O+O run
* Alignment
Agenda:
1. Production status;
https://bnl.zoomgov.com/j/1604529352?pwd=VkdvUEx3RHliN1lGaUR3bVNidWJNQT09
8:00 to 8:45:
* sTGC shipping incident
Starting 8:45 am
Agenda:
* update of all subsystems, integration, slowcontrol and software All
Minutes:
1) Recent updates on data production and restoration
- DAQ production
- Run17 pp 510 st_physics (94%, finish by the end of June), st_rp (52%)
https://bnl.zoomgov.com/j/1604529352?pwd=VkdvUEx3RHliN1lGaUR3bVNidWJNQT09
Agenda:
1.Run status
"what if"opportunity: dAu
Agenda:
* update of all subsystems, integration, slowcontrol, trigger and software All
Note:
The observed difference beween SL12 and SL13 seems to hold even when the same daq files are ruconstructed manually under SL12d_embed.
Agenda:
1. Production status;
agenda:
- operation
- calibration status
- FF field
Yuri posted additional slide on FF DCA_y