Meeting |
JetCorr PWG meeting |
hanseul |
|
Meeting |
S&C Management Meeting |
dongx |
|
Meeting talk |
Pre-installation Testing |
yezhenyu |
|
Meeting talk |
Simulation Updates |
yezhenyu |
|
Meeting talk |
Online and Offline Software |
yezhenyu |
|
Meeting talk |
Inner Signal Cables |
yezhenyu |
|
Meeting talk |
Cooling and Integration |
yezhenyu |
|
Meeting talk |
Follow-up on action items |
yezhenyu |
|
Meeting talk |
Pre-installation Testing |
yezhenyu |
|
Meeting talk |
Cables, ABC |
yezhenyu |
|
Meeting talk |
Cooling and Integration |
yezhenyu |
|
Meeting talk |
Simulation Updates |
yezhenyu |
|
Meeting talk |
Online and Offline Software |
yezhenyu |
|
Meeting talk |
Follow-up on action items |
yezhenyu |
|
Meeting |
STAR Forward Silicon Tracker Meeting |
yezhenyu |
|
Blog entry |
20210727_QPT_PXi_CF_200GeV(China) |
kmi |
|
Image |
Figure 3 |
adams92 |
|
Image |
Figure 3 |
adams92 |
|
Image |
Figure 2 |
adams92 |
|
Image |
Figure 1 |
adams92 |
|
Blog entry |
v2 analysis of ɸ-mesons at √sNN = 7.7 GeV in Au+Au collisions in run-21 |
pdixit |
|
Meeting talk |
Radiation Damage Monitor |
ananyapaul |
|
Conference session |
Council meeting |
marr |
|
Meeting talk |
AOB |
dongx |
|
Meeting talk |
BES-II production library readiness |
dongx |
|