All
Type | Term | Title | Author | Replies | Last Post |
---|---|---|---|---|---|
Image | Subsys-BEMC | BEMC modules with the beam pipe and cradles | tai | 2007-10-18 19:42 | |
Image | Subsys-BEMC | gallery | tai | 2007-10-18 19:42 | |
Image | Subsys-BEMC | Fiber Assembly Area (MSU) | kocolosk | 2007-10-18 19:12 | |
Image | Subsys-BEMC | Fiber Cable Checker (MSU) | kocolosk | 2007-10-18 19:11 | |
Image | Subsys-BEMC | Fiber Cable Quality Control (MSU) | kocolosk | 2007-10-18 19:08 | |
Image | Subsys-BEMC | Fiber Cable Connectors (MSU) | kocolosk | 2007-10-18 19:07 | |
Image | Subsys-BEMC | Fiber Cable Diamond Polisher, back view (MSU) | kocolosk | 2007-10-18 19:07 | |
Image | Subsys-BEMC | Fiber Cable Diamond Polisher, front view (MSU) | kocolosk | 2007-10-18 19:06 | |
Image | Subsys-BEMC | Fiber Cable Gluing Jig (MSU) | kocolosk | 2007-10-18 19:01 | |
Image | Subsys-BEMC | Audio-Visual Center (1998 Test Beam) | kocolosk | 2007-10-18 16:19 | |
Image | Subsys-BEMC | Data Acquisition Electronics (1998 Test Beam) | kocolosk | 2007-10-18 16:18 | |
Image | Subsys-BEMC | Back of Module-0 (1998 Test Beam) | kocolosk | 2007-10-18 16:16 | |
Image | Subsys-BEMC | Front of Module-0 (1998 Test Beam) | kocolosk | 2007-10-18 16:14 | |
Image | Subsys-BEMC | Some of the Installation Team (1998 Test Beam) | kocolosk | 2007-10-18 16:12 | |
Image | Subsys-BEMC | Module Being Placed on Table (1998 Test Beam) | kocolosk | 2007-10-18 16:10 | |
Image | Subsys-BEMC | Module hanging from crane on sling (1998 Test Beam) | kocolosk | 2007-10-18 16:09 | |
Image | Subsys-BEMC | Construction Photo of STAR showing BEMC Rails Being Aligned | kocolosk | 2007-10-18 16:05 | |
Image | Subsys-BEMC | Construction Photo of STAR showing BEMC Rails | kocolosk | 2007-10-18 16:00 | |
Image | Subsys-BEMC | Di-jet event in Barrel EMC from year < 2006 | kocolosk | 2006-10-26 08:36 |