Stv progress & status

Speaker : Jason Webb ( BNL )


Talk time : 12:45, Duration : 00:20

AOB

Speaker : All ( All )


Talk time : 13:05, Duration : 00:10

AOB list is shortening (this is good)

VPD and TOF calibrations

Speaker : Joey Butterworth ( Rice )


Talk time : 12:30, Duration : 00:15

p+p 500 GeV dE/dx status

Speaker : Mike Skoby ( CEEM )


Talk time : 12:15, Duration : 00:15

News from the Run

Speaker : Salvatore Fazio ( BNL )


Talk time : 12:00, Duration : 00:15

Software and Computing Meeting

2013-04-10 12:00
2013-04-10 13:00
America/New York
Wednesday, 10 April 2013
1-189, SRN, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00News from the Run ( 00:15 ) 1 fileSalvatore Fazio (BNL)
12:15p+p 500 GeV dE/dx status ( 00:15 ) 1 fileMike Skoby (CEEM)
12:30VPD and TOF calibrations ( 00:15 ) 1 fileJoey Butterworth (Rice)
12:45Stv progress & status ( 00:20 ) 2 filesJason Webb (BNL)
13:05AOB ( 00:10 ) 0 filesAll (All)

Central Production from 2009 data

Speaker : Leszek Adamczyk


Talk time : 10:20, Duration : 00:20

Rapidity gap trigger tests

Speaker : R. Debbe


Talk time : 10:20, Duration : 00:20

J/psi in U+U 193 GeV run 12

Request TypeStandard Embedding request (particle in real events)
DescriptionJ/psi in U+U 193 GeV run 12

Generator: 100% of J/psi->ee

Number of events: 300 K
Data set: min-bias U+U 193 GeV, run 12, with valid BEMC+TOF data

Triggres:
 - vpd-zdc-mb (trigger Id=400004, 400014) 
 - vpd-zdc-mb-protected (trigger Id=400005, 400015, 400025, 400035)

Production SL12d
Library SL12d
Geometry:  y2012

Particles per event: 5% of multiplicity

|VertexZ| < 200 cm
-1.2 < rapidity < 1.2, flat
 0 < pT < 15 GeV/c, flat 




General Information
Request ID20131501
Priority: EC0
Priority: pwgNormal
StatusLarger (or full) sample done, producing PWG QA [6/7]
Physics Working GroupHeavy Flavor
Requested bykikola
Contact email(s)dkikola@gmail.com,Kukral.Ota@seznam.cz,petrchal@rcf.rhic.bnl.gov
Contact phone(s)
PWG email(s)heavy-hn@www.star.bnl.gov
Assigned Deputy: Not assigned
Assigned Helper: Not assigned
Global Simulation Settings
Request type:Standard Embedding request (particle in real events)
Number of events500000 = 500 K
Magnetic Field---- SELECT MAGFIELD ----
Collision TypeUU 193GeV
Centralityb: full range
BFC tags
Production---- SELECT PRODUCTION TAG ----
Geometry: simuy2012a
Geometry: recoy2012a
LibrarySL12d
Vertex optionForce vertex as MC vertex
Pileup optionNo
Detector SetTPC + BEMC + TOF
Data Sources
Real Data
File lookup&amp;amp;amp;amp;nbsp;
Single Particle MC
ParticleAlpha
Particle settingsdalitz
Particles per event5
Vertex Z, cm-200 < Vertex < 200
Gaussian sigma in X,Y,Z (cm), if applicable0, 0, 0
Vertex offset: x, mm0
Vertex offset: y, mm0
Φ (phi), radian0 < Φ < 6.29
η (eta)-1.2 < η < 1.2
Pt, GeV0 < Pt < 15

Alignment and t-scale

Speaker : Ivan Koralt ( ODU )


Talk time : 10:00, Duration : 00:20

 

estar phone meeting

2013-04-09 12:00
America/New York
Tuesday, 9 April 2013
EVO/SeeVogh #12 3569 (noon-1PM EDT) , at 16:00 (GMT), duration : 00:00
Start: 2013-04-09 12:00
End: 2013-04-09 13:00
Timezone: America/New York
Tuesday, 09 April 2013
SeeVogh 12 3569 (Tuesday 04/09/2013 noon EDT), duration : 01:00
Agenda:
 
1) Update on FCS
2) update on iTPC
   a) document and progress
      i) draft, proposals
      ii) design
      iii) electronics news
   b) TPC gas Upgrade? (Nikolai) 
      http://drupal.star.bnl.gov/STAR/system/files/STAR%20TPC%20gas%20upgrade.docx
   c) simulations (Hyperon reconstruction) Yifei Xu (SINAP) 
       http://drupal.star.bnl.gov/STAR/system/files/Lambda_Efficiency_itpc_Simulation_Yifei_Xu.pdf
   d) sign up for itpc-l@lists.bnl.gov
  
3) Future Upgrades write-up to ALD (Carl)
 
4) EIC R&D calls (proposal deadline 05/17/2013)

Other items?
 
Thanks!
 
Ernst and Zhangbu

eSTAR meeting

2013-04-16 13:00
2013-04-16 14:00
America/New York
Tuesday, 16 April 2013
EVO/SeeVogh - ID 14 3853, at 17:00 (GMT), duration : 01:00

eSTAR meeting

2013-04-09 13:00
2013-04-09 14:00
America/New York
Tuesday, 9 April 2013
EVO/SeeVogh - ID 14 3853, at 17:00 (GMT), duration : 01:00

Trigger Board Run13

2013-06-03 11:30
America/New York
Monday, 3 June 2013
BNL, at 15:30 (GMT), duration : 00:00
2013 June 3 (Monday) 11:30-12:30 (EDT) 1-187 at BNL or SeeVogh, EVO or Phone Bridge ID: 15 3955 (344-6100) Previous Meeings: 11/05, 11/19, 12/10 , 12/17, 1/07, 1/14, 1/28, 2/04, 2/25, 3/04, 3/11, 3/18, 3/25, 4/01, 4/08, 4/15, 4/22, 4/29, 5/06, 5/13, 5/20
TimeTalkPresenter
11:30Report on day 151 and 152 low lumi runs ( 00:20 ) 1 fileR. Debbe

Trigger Board Run13

2013-05-20 11:30
America/New York
Monday, 20 May 2013
BNL, at 15:30 (GMT), duration : 00:00
2013 May 20 (Monday) 11:30-12:30 (EDT) 1-187 at BNL or SeeVogh, EVO or Phone Bridge ID: 15 3955 (344-6100) Previous Meeings: 11/05, 11/19, 12/10 , 12/17, 1/07, 1/14, 1/28, 2/04, 2/25, 3/04, 3/11, 3/18, 3/25, 4/01, 4/08, 4/15, 4/22, 4/29, 5/06, 5/13
TimeTalkPresenter
11:30first low lumi run for UPCpp ( 00:20 ) 1 file

Trigger Board Run13

2013-05-13 11:30
America/New York
Monday, 13 May 2013
BNL, at 15:30 (GMT), duration : 00:00
2013 May 13 (Monday) 11:30-12:30 (EDT) 1-187 at BNL or SeeVogh, EVO or Phone Bridge ID: 15 3955 (344-6100) Previous Meeings: 11/05, 11/19, 12/10 , 12/17, 1/07, 1/14, 1/28, 2/04, 2/25, 3/04, 3/11, 3/18, 3/25, 4/01, 4/08, 4/15, 4/22, 4/29, 5/06

Trigger Board Run13

2013-05-06 11:30
America/New York
Monday, 6 May 2013
BNL, at 15:30 (GMT), duration : 00:00
2013 Apr 28 (Monday) 11:30-12:30 (EDT) 1-187 at BNL or SeeVogh, EVO or Phone Bridge ID: 15 3955 (344-6100)
  • Status (RHIC,STAR,TCU2,MTDalgo)
Previous Meeings: 11/05, 11/19, 12/10 , 12/17, 1/07, 1/14, 1/28, 2/04, 2/25, 3/04, 3/11, 3/18, 3/25, 4/01, 4/08, 4/15, 4/22, 4/29

Trigger Board Run13

2013-05-27 11:30
America/New York
Monday, 27 May 2013
BNL, at 15:30 (GMT), duration : 00:00

Trigger Board Run13

2013-04-29 11:30
America/New York
Monday, 29 April 2013
BNL, at 15:30 (GMT), duration : 00:00
2013 Apr 28 (Monday) 11:30-12:30 (EDT) 1-187 at BNL or SeeVogh, EVO or Phone Bridge ID: 15 3955 (344-6100)
  • Status (RHIC,STAR,TCU2,MTDalgo)
  • HFT trigger needs - Flemming
Previous Meeings: 11/05, 11/19, 12/10 , 12/17, 1/07, 1/14, 1/28, 2/04, 2/25, 3/04, 3/11, 3/18, 3/25, 4/01, 4/08, 4/15, 4/22

Trigger Board Run13

2013-04-22 11:30
America/New York
Monday, 22 April 2013
BNL, at 15:30 (GMT), duration : 00:00
2013 Apr 01 (Monday) 11:30-12:30 (EDT) 1-187 at BNL or SeeVogh, EVO or Phone Bridge ID: 15 3955 (344-6100) Previous Meeings: 11/05, 11/19, 12/10 , 12/17, 1/07, 1/14, 1/28, 2/04, 2/25, 3/04, 3/11, 3/18, 3/25, 4/01, 4/08, 4/15