Run 2012 - pp 510GeV Longitudinal - MuDST QA

Run 2012 - MuDST QA

  • Two sets of plots attached - Before QA and After QA (Trial1)
  • Total number of runs - 734

IFF paper responses to spin pwg I

 

NPE v2 in Au+Au 200 - 39 GeV: purity study

Drafts of Contribution to Proceedings of MENU 2013

 

APS Prairie talk


Talk time : 09:50, Duration : 00:20

 

DAQ_SST update

Rho normalization report

Speaker : R. Debbe


Talk time : 09:30, Duration : 00:20

2013 Hard Probes Drats

Stv: performance of iterations

Introduction:

STAR HLT Weekly Discussion

 HTL TPC maps issue.

Run12 Trans Analysis Update - Jet Meeting

 

EMC Meeting 2013-10-29

 

Quarkonium HP2013 talk

Minutes


Talk time : 13:10, Duration : 00:20

 

 

1) There was some discussion about the draft task-list posted on Drupal. This list will

Some pdf documents about PMT for information and references, and some possibly fittable socket.

Here are some documents that I find while I search for suitable sockets, should be some good information source to read:

Simulation work on alignment update


Talk time : 12:50, Duration : 00:20

 

Task-list draft

Speaker : Xin, Flemming, Spiros


Talk time : 12:30, Duration : 00:20

 

eSTAR biweekly meeting

2013-10-25 11:00
America/New York
Friday, 25 October 2013
SeeVogh, phone ID 100 0371, at 15:00 (GMT), duration : 00:00
Charges for BES whitepaper, p+p / p+A Letter of Intent

Next steps for p+p / p+A letter of intent:
  • Tables with key measurements,
  • Face-to-face meetings
 Fast simulator used for eSTAR: description, code

Updated Phototube base PCB

Updated Phototube base PCB

I've added in the central cut in the original board, in case there turns out to be a need for it, as well as put all of the wiring on one side of the board.

WX commments on AuAu D0 paper.