Minutes


Talk time : 13:30, Duration : 00:20

H for Run10 Au+Au 200 GeV with library SL10k

Request TypeStandard Embedding request (particle in real events)
Description

Mass =3D 2.192 GeV/c2
decay - Lambda (Proton-Pion), Proton, Pion
Half life =3D (lambda half life)/2
Trigger: Minimum Bias
|vz|<  40 cm
flat rapidity, |y|<  1
5% of multiplicity
200K events with exponential weighted pT.

General Information
Request ID2012104
Priority: EC0
Priority: pwgHigh
StatusNew
Physics Working GroupBulk correlations
Requested bysss
Contact email(s)sss@iopp.ccnu.edu.cn, neau2802@gmail.com
Contact phone(s)
PWG email(s)bulkcorr-hn@www.star.bnl.gov
Assigned Deputy: Not assigned
Assigned Helper: Not assigned
Global Simulation Settings
Request type:Standard Embedding request (particle in real events)
Number of events1
Magnetic Field---- SELECT MAGFIELD ----
Collision Type---- SELECT COLLISION TYPE ----
Centralitycentral: 0-5%
BFC tags
ProductionP10ik
Geometry: simu---- SELECT GEOMETRY ----
Geometry: reco---- SELECT GEOMETRY ----
LibrarySL10k
Vertex option---- SELECT VERTEX OPTION ----
Pileup optionNo
Detector Set
Data Sources
Real Data
File lookup
Single Particle MC
ParticleAlpha
Particle settingsdalitz
Particles per event1
Vertex Z, cm-30 < Vertex < 30
Gaussian sigma in X,Y,Z (cm), if applicable0, 0, 0
Vertex offset: x, mm0
Vertex offset: y, mm0
Φ (phi), radian0 < Φ < 6.29
η (eta)-0.5 < η < 0.5
Pt, GeV0 < Pt < 30

Lambda (Antilambda) for Run 10 Au+Au 200 GeV

Request TypeStandard Embedding request (particle in real events)
Description

200K events with exponential weighted pT (pT*exp(-pT/T)) with T = 350 MeV

|Vz|<  40 cm
flat rapidity, |y|<1
5% of multiplicity

Lambda (Antilambda) decay to p pi
Trigger: Minimum Bias (260001,260011,260021,260031)

General Information
Request ID2012103
Priority: EC0
Priority: pwgHigh
StatusLarger (or full) sample done, producing PWG QA [6/7]
Physics Working GroupBulk correlations
Requested bysss
Contact email(s)sss@iopp.ccnu.edu.cn, neau2802@gmail.com
Contact phone(s)
PWG email(s)bulkcorr-hn@www.star.bnl.gov
Assigned Deputy: Not assigned
Assigned Helper: Not assigned
Global Simulation Settings
Request type:Standard Embedding request (particle in real events)
Number of events1
Magnetic Field---- SELECT MAGFIELD ----
Collision Typeauau 200GeV
Centralitycentral: 0-5%
BFC tags
ProductionP10ik
Geometry: simu---- SELECT GEOMETRY ----
Geometry: reco---- SELECT GEOMETRY ----
LibrarySL10k
Vertex option---- SELECT VERTEX OPTION ----
Pileup optionNo
Detector Set
Data Sources
Real Data
File lookup
Single Particle MC
ParticleAlpha
Particle settingsdalitz
Particles per event1
Vertex Z, cm-30 < Vertex < 30
Gaussian sigma in X,Y,Z (cm), if applicable0, 0, 0
Vertex offset: x, mm0
Vertex offset: y, mm0
Φ (phi), radian0 < Φ < 6.29
η (eta)-0.5 < η < 0.5
Pt, GeV0 < Pt < 30

higher moments simulation request for AuAu 19.6 GeV

Request TypeEvent generator simulation
Description

No. of Events : 3 M

o Generate events in SL11d_emebed
o Reconstruct events in SL11d
General Information
Request ID20121002
Priority: EC0
Priority: pwgHigh
StatusLarger (or full) sample done, producing PWG QA [6/7]
Physics Working GroupBulk correlations
Requested bysss
Contact email(s)shishusu@gmail.com, nihar@rcf.rhic.bnl.gov
Contact phone(s)
PWG email(s)bulkcorr-hn@www.star.bnl.gov
Assigned Deputy: Not assigned
Assigned Helper: Not assigned
Global Simulation Settings
Request type:Event generator simulation
Number of events1
Magnetic FieldReversed Full-Field
Collision TypeAuAu 19.6
Centralityb: full range
BFC tags
Production---- SELECT PRODUCTION TAG ----
Geometry: simuy2011a
Geometry: recoy2011a
LibrarySL11d_embed
Vertex option---- SELECT VERTEX OPTION ----
Pileup optionNo
Detector Set
Data Sources
MC Event Generator
Event generatorHijing
Extra options

Vertex-Z:  -30 to 30 cm

Need kinematics files.

Vertex Z, cm-30 < Vertex < 30
Gaussian sigma in X,Y,Z (cm) if applicable0, 0, 0
Vertex offset: x, mm0
Vertex offset: y, mm0
Φ (phi), radian0 < Φ < 6.29
η (eta)-2.5 < η < 2.5
Pt bin, GeV0 < Pt < 0
Macro file

X11 font rehash

If your X11 installation has a problem with fonts and font aliases, try the below:

prototype patch Acceptance/Efficiency for D0s

Speaker : jonathan


Talk time : 13:50, Duration : 00:20

Basically it's the same analysis than the one shown at the collaboration meeting, but with a pt-spectrum D0's.

It counts the # of D0's after cuts and for each of the prototype.

IST numbering


Talk time : 13:30, Duration : 00:20

HFT Software

2012-03-16 14:30
America/New York
Friday, 16 March 2012
510-4867333, at 18:30 (GMT), duration : 00:00

HFT Software

2012-03-23 14:30
America/New York
Friday, 23 March 2012
510-4867333, at 18:30 (GMT), duration : 00:00


510-4867333

Items for this Friday's meeting are:

1) Hao Qiu has prepared an informal presentation on his
     analysis of the single-thinned chip survey with the new
    CMM machine, optical probe. I asked him to present it to
    the group. We also had the chance at LBL to discuss a bit
    about the geometry structures in detail were I promised to
    provide some details on previous SVT work and details/examples
    on structures we use.

2) Jonathan made some progress (timing)  and managed to fix some bugs
    in reconstruction with new geometry.

Other Items:

a) Flemming provided some prelim drawings of the beam pipe. They are good
    to be used for modeling.

b) I talked to H.W. about big chunks of mass still missing from modeling. Some of
     his feedback is posted on the action-items of Geometry-review page:
http://drupal.star.bnl.gov/STAR/event/2012/03/09/hft-software/round-table-discussion-action-items-defined-20

c)  I talked to H.M. (with J.T and M.L) about a plan for SSD ladder survey at LBL.
     Ladder(s) are stuck in customs on their way to LBL, not for long I hope.
     We all have an understanding about what need to be done.

d) I had a discussion with Xin on the Offline structures/needs. There is
    a multitude of structures we need to touch or build from scratch and
    associated issues like:
    1) StEvent Hit containers -> move away from RnD to PXL, IST etc
      with proper structure, e.g. instead of layer, ladder, pixel have sector,
      ladder, pixel for PXL etc. The same for StMcEvent containers
    2) Hit info on Tracks. make sure it is done properly, e.g. possible # hits
    3) Is current MuDst info sufficient? We have made proposal to modify
        and update the info (+Evaluation, minimc info). Need to finalize/implement.
         We both agreed/emphasized the use of Dcageometry info in HF reconstruction
         as well as Kalman fitters (minimum work is needed to fully deploy this).
    4) Slow/Fast simulators: Move final scheme/products in place of current
         short-cut one.
This is the road map more or less, also by looking at the overall execution flow
of software.

e) There are two reviews coming up we need to keep in mind:
   i) One review for software/procedure that connects metrology to geometry
      structures in the Db. This is going to happen in about a month from now.
      By then we need to have the test-sector CMM data taken (this is a
     pre-requisite for the review).
   ii) Track Alignment structures/procedures in place (prototype run etc). This
      will happen sometime in the Fall.

TimeTalkPresenter
13:30Beam pipe etc pics ( 00:10 ) 4 files
13:40Single sensor CMM measurements ( 00:20 ) 0 filesHao
14:00item 2. : bfc timing ( 00:20 ) 0 files
14:20item d. : offline structures ( 00:20 ) 1 file

HFT Y2013 Geometry Review

2012-03-09 13:30
America/New York
Friday, 9 March 2012
BNL/EVO, at 18:30 (GMT), duration : 00:00

You have BOOKED a meeting in EVO (http://evo.caltech.edu).

Title:        HFT Y2013 Geometry Review - 

PLACE: BNL,  Rm 1-189 from 1.30-3.30 Fri 3/9/2012
Description:    STAR-HFT detector internal review
Community:    STAR
Password:    geometry

Meeting Access Information:
- Meeting URL
    http://evo.caltech.edu/evoNext/koala.jnlp?meeting=MaMDMt2I22D2Du9e98DI9a

- Password: geometry
- Phone Bridge
    ID: 487 6317
    Password: 1193

Eastern Standard Time (-0500)
    Start    2012-03-09  13:30
    End      2012-03-09  18:00

 

TimeTalkPresenter
13:30Overview 10' ( 00:20 ) 1 fileSpiros
13:40Comparisons of SW model and Flemmings implementation ~15' ( 00:20 ) 1 fileFlemming
13:50Geant modeling and comparison with SW model 20-30' ( 00:20 ) 3 filesJonathan
13:55Comments after walkthrough of code [in advance] (issues, clarity etc) 10-15' ( 00:20 ) 1 fileJason
14:00HFT-Numbering scheme/doc - 10' ( 00:20 ) 2 filesSpiros
14:15BFC-tests with simple tracks. Timing/Issues 10-15' ( 00:20 ) 3 filesJonathan
14:35Action items/Summary ( 00:20 ) 0 filesAll

HFT Software

2012-03-02 13:30
America/New York
Friday, 2 March 2012
510-4867333, at 18:30 (GMT), duration : 00:00

Agenda for Internal Review of Y2013-base geometry

Place: BNL/EVO,  Date: March 9, 2012

Reviewers:  Eric Anderssen, Howard Wieman (rerp. by Leo Greiner),   Yuri Fisyak , Jason Webb, Xin Dong, +"Management" (not Flemming since he is an author)


Presentations/ Content

- Overview 10' Spiros
    * context but also what is this geometry for
    * This is not only about what the review is
      but also what we want from the product

- comparisons of SW model and Flemmings implementation
       20' Flemming

- Geant modeling and comparison with SW model
       20-30' Jonathan

- Comments after walkthrough of code (issues, clarity etc)
       10-15' Jason (?)

- Numbering schemes - 10' Spiros (?) Mostly restate what
       was agreed upon

- BFC-tests with simple tracks. Timing/Issues
      10-15' Jonathan

- Round table discussion. Action items defined.

 

TimeTalkPresenter
13:30IST numbering ( 00:20 ) 1 file
13:30Minutes ( 00:20 ) 1 file
13:50prototype patch Acceptance/Efficiency for D0s ( 00:20 ) 2 filesjonathan

IST prototype stave testing

Speaker : Dr. Gerrit J. van Nieuwenhuizen II ( Massachusetts Institute of Technology )


Talk time : 13:45, Duration : 00:20

LHC writeup

dedx

dedx

dedxVsPRec

dedxVsPRec

Local parity violation

Under:
Local parity violation

Run12 status

Embedding summary

Coffee break

Software summary