Global Support Structure, Assembly, and installation

Speaker : Eric Anderssen ( LBL )


Talk time : 14:15, Duration : 00:45

HFT Physics

Speaker : Nu Xu ( LBL )


Talk time : 13:30, Duration : 00:45

IST sub-system

Speaker : Bernd Surrow ( MIT )


Talk time : 11:35, Duration : 00:45

SSD electronics Upgrade

Speaker : Micheal LeVine ( BNL )


Talk time : 10:50, Duration : 00:45

Break


Talk time : 10:30, Duration : 00:20

Pixel detector

Speaker : Howard Wieman ( LBL )


Talk time : 09:45, Duration : 00:45

 Pixel detector sub-system:

mechanical and electric

Project Overview

Speaker : Flemming Videbaek ( BNL )


Talk time : 09:00, Duration : 00:45

 Introduction to meeting;

Version 0 of  CD-1 review talk

HFT meeting

2009-09-03 09:00
Etc/GMT-5
Thursday, 3 September 2009
room 3-192 Physics, BNL, at 13:00 (GMT), duration : 00:00

 HFT pre-dry run. 

The meeting will have a number of talks that matches those for the CD-1 review of the HFT project. 

In addition there will be discussion on outstanding issues surrounding CDR, other document, cost and schedule.

A real dry-run will be scheduled in about one month; and the review likely in the week of November 9.

TimeTalkPresenter
09:00Project Overview ( 00:45 ) 1 fileFlemming Videbaek (BNL)
09:45Pixel detector ( 00:45 ) 1 fileHoward Wieman (LBL)
10:30Break ( 00:20 ) 0 files
10:50SSD electronics Upgrade ( 00:45 ) 1 fileMicheal LeVine (BNL)
11:35IST sub-system ( 00:45 ) 0 filesBernd Surrow (MIT)
13:30HFT Physics ( 00:45 ) 2 filesNu Xu (LBL)
14:15Global Support Structure, Assembly, and installation ( 00:45 ) 1 fileEric Anderssen (LBL)
15:00Discussion on documents and issues for CD-1 ( 02:00 ) 0 filesAll

Test of corrected EEMC geometry: pion reconstruction

Test of Corrected EEMC geometry: Pion Reconstruction

Preview efficiencies from pre-production SL09b/W

Speaker : Jan Balewski ( MIT )


Talk time : 12:40, Duration : 00:10

AOB

Speaker : All ( All )


Talk time : 12:50, Duration : 00:10

The last You do not have access to view this node

We will expand on it adding

Embedding progress overview, opened problems

Speaker : Renee Fatemi ( UKY )


Talk time : 12:20, Duration : 00:20

Calibration progress and overview for Run 9

Speaker : Gene Van Buren ( BNL )


Talk time : 12:00, Duration : 00:20

Software and Computing phone meeting

2009-09-02 12:00
2009-09-02 13:00
Etc/GMT-5
Wednesday, 2 September 2009
1-189, EVO, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00Calibration progress and overview for Run 9 ( 00:20 ) 1 fileGene Van Buren (BNL)
12:20Embedding progress overview, opened problems ( 00:20 ) 1 fileRenee Fatemi (UKY)
12:40Preview efficiencies from pre-production SL09b/W ( 00:10 ) 1 fileJan Balewski (MIT)
12:50AOB ( 00:10 ) 0 filesAll (All)

First draft of bins for theory analysis of delta G projected data

attached is a file describing suggested bins for Werner Daniel et al

to set up for projected data sets in their global fitting code.

FGT safety review - electrical - 9/2/2009

Here is the presentation and a zipfile of documentation, for the electrical aspects of the FGT, to be presented 9/2/2009.

Run 9 BSMD Online Monitoring Documentation

For run 9, BSMD performance was monitored by looking at non-zero-suppressed events.  The code is archived at /star/institutions/mit/wleight/archive/bsmdMonitoring2009/.  This blog page wi

CD1 and related items (click)

Speaker : All


Talk time : 13:50, Duration : 00:20

....I do have some general and some specific
comments on the science section that Hans Georg gave me on Aug. 19 when
I was at LBL:

CDR_v19 is here for comments (new file 9/6/09)

Speaker : All


Talk time : 13:30, Duration : 00:20

HFT Software

2009-09-04 13:30
2009-09-04 14:30
Etc/GMT-5
Friday, 4 September 2009
510-4867333, at 17:30 (GMT), duration : 01:00

Here

TimeTalkPresenter
13:30CDR_v19 is here for comments (new file 9/6/09) ( 00:20 ) 1 fileAll
13:50CD1 and related items (click) ( 00:20 ) 0 filesAll
14:10CDR_V20 (NEW-NEW) ( 00:20 ) 1 file