STAR Management Meeting

2009-07-16 11:00
2009-07-16 12:00
Etc/GMT-7
Thursday, 16 July 2009
BNL, 50-Orange Room, at 15:00 (GMT), duration : 01:00

EVO: Title: STAR Management Meeting // Community:  STAR // Password:  star

           Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 923442 // Password: 0952

   Time:  11am - 12noon EDT

 * --===================================================================--*

  Agenda:

    1)    NPE and e-h Results, publications - Huan, Bedanga, ...
    2)    The next STAR Decadal Plan -  Nu

    3)    AOB

* --====================================================================--*

               Brief Summary:

  0) Attendency: Olga, Jerome, Jamie, Flemming, Helen, Xin, Nu, Bedanga

  1) NPE issues: (i) The management feels there more issues to be addressed by the task force. Based on the discussion and Huan's report at the last

      Analysis Meeting, the management will send a note to the task force. A list of specific checks will be included in the note.   (ii) WIll send a message to

      Editor at PRL regarding STAR paper "Charmed hadron production at low transverse momentum in Au+Au collisions at RHIC" submitted on May

      4th, 2008, 0805.0364. Inform the Editor that we are doing internal cross-checks and the process may take sometime to complete.

  2) S&T review issues: (i) Timely funding and scheduling for R&D at RHIC. RHIC performance for polarized pp collisions, we will request 30 cryo-weeks for

      future runs; (ii) TPC: operation team including software issue. Jim should be part of the solution; (iii) FTPC team: A student from India group (VECC),

      with the help of Terry, J. Syboth and P. Syboth; (iv) Future upgrade scheduling and integrations.

  3) QM09 Proceedigns: potential issues with the eta/s analysis (BulkCorr) and Jet reconstruction (JetCorr).

 

  Notes:

   1) STAR TPC Review (key= star2009),  June 4,5, BNL. Ron Settler (chair). Review report.

   2) NPE Committee, H. Huang (chair)

 

  Future Meetings:

    1) BNL Science and Technology Review, July 22-24, BNL

    2) STAR ToF Closeout Review, Aug. 10-11, BNL

    3) STAR Regional meeting: Sept. 25-26, Rio, Brazil

    4) SQM2009: Sept. 27-Oct. 2, Buzios, Brazil

    5) STAR Collaboration meeting, Oct. 5-10, Berkeley

    6) DNP 2009, Oct. 13 - 17, Waikoloa

Strips With Very Few Entries

Some strips in module 103p have very few entries, e.g. strip 15407p:

Figure 1: Strip 15407p

AOB & Discussion

Speaker : All


Talk time : 11:00, Duration : 00:20

SSD/FGT cable interface

Speaker : Howard Matis


Talk time : 10:40, Duration : 00:20

FGT status - Assembly and installation schedule - Needs at BNL

Speaker : Bernd Surrow


Talk time : 10:20, Duration : 00:20

Cones, models and analysis

Speaker : Jason Bessuilie


Talk time : 10:00, Duration : 00:20

Plan for insertion and extract of pixel in HFT

Speaker : Howard Weiman


Talk time : 09:40, Duration : 00:20

Assembly plan for beampipe, cone and detectors

Speaker : Eric Anderssen


Talk time : 09:10, Duration : 00:30

introduction : HFT status & schedule

Speaker : F.Videbaek


Talk time : 09:00, Duration : 00:10

Introduction : HFT status & schedule

Speaker : F.Videbaek


Talk time : 09:00, Duration : 00:05

QM09 proceeding, fourth version

Hi All,

I have made the modifications to my QM09 proceeding recommended by Xin. Comments are suggestions are welcome.

Bertrand

J/psi from HLT

Speaker : Hao Qiu ( IMP )


Talk time : 18:20, Duration : 00:20

Update on High xF J/psi

Speaker : Chris Perkins ( UC Berkeley )


Talk time : 18:00, Duration : 00:20

BBC coincidence vs. time in fill (Run 8 pp)

During the questions time after You do not have access to view this node, I was asked if any of the

BSMD Relative Gains Update 07/08

Please see this blog post for an introduction to the method.

Drupal agenda extension request (description)

Easy agenda navigation

Let's take an example ...

Contributions of back-to-back semi-hard jets to STAR's parity violation measure

J/psi from High Level Trigger

Speaker : Hao Qiu ( IMP/BNL )


Talk time : 10:00, Duration : 00:30

EEMC @ Run 9 EOR and Summer Shutdown

-- On 4 July at EOR 9 of 200 GeV pp collisions shutdown I recorded many of the

operating parameters of the Endcap EMC (EEMC) using screen shots of the

BSMDP Gain Status by Module

Fill 10471 VPDMB Events