LFSUPC (anti-)Lambda at 62p4 feeddown studies Dingwei

Request TypeStandard Embedding request (particle in real events)
DescriptionParticle: Lambda, Anti-Lambda
System: Au+Au
Energy: 62.4 GeV
Year: 2010
Library: SL10k
Production Series: P10ik
Data stream: st\_physics
Triggers: 270001,270011,270021, 270005
Pt: 0.0-7.0 GeV/c - flat
Rapidity: |y| < 1.0 -flat
Phi: 0-2pi
Pseudo rapidity: |eta|<1.0 -flat
Vz: |Vz|<30 cm
Number of event 500 k
bad\_run\_list\_62GeV\[105\] = {11080072,11081023,11081025,11082012,11082013,11082046,11082056,11082057,11084009,11084011,11084012,11084013,11084020,11084021,11084035,11084044,11084064,11085015,11085025,11085030,11085046,11085055,11085056,11085057,11086005,11086007,11087001,11087002,11087003,11087004,11088013,11089026,11089028,11089029,11089055,11089068,11089072,11091007,11091015,11091021,11091078,11092010,11092011,11092012,11092032,11092033,11092034,11092067,11092096,11093001,11094016,11094017,11094018,11094019,11094020,11094021,11094022,11094023,11094024,11094027,11094028,11094042,11094044,11094045,11094046,11094047,11094048,11094050,11094051,11094052,11094053,11094054,11094055,11094074,11094075,11094077,11095001,11095002,11095003,11095004,11095005,11095006,11095009,11095010,11095011,11095012,11095013,11095014,11095015,11095022,11095040,11095048,11095050,11095051,11095061,11095062,11095063,11095064,11095082,11095087,11096024,11096039,11096043,11096044,11097093}
General Information
Request ID20210801
Priority: EC0
Priority: pwgNormal
StatusLarger (or full) sample done, producing PWG QA [6/7]
Physics Working GroupLFS-UPC
Requested byjdb
Contact email(s)jbrandenburg@bnl.gov
Contact phone(s)
PWG email(s)lfsupc-hn@www.star.bnl.gov
Assigned Deputy: Not assigned
Assigned Helper: Not assigned
Global Simulation Settings
Request type:Standard Embedding request (particle in real events)
Number of events500000 = 500 K
Magnetic FieldReversed Full-Field
Collision Typeauau 62GeV
Centrality---- SELECT CENTRALITY ----
BFC tags
Production---- SELECT PRODUCTION TAG ----
Geometry: simu---- SELECT GEOMETRY ----
Geometry: reco---- SELECT GEOMETRY ----
Library---- SELECT STAR LIBRARY ----
Vertex option---- SELECT VERTEX OPTION ----
Pileup optionNo
Detector Set
Data Sources
Real Data
File lookup
Single Particle MC
ParticleLambda
Particle settingsFlat in Pt
Particles per event5
Vertex Z, cm-30 < Vertex < 30
Gaussian sigma in X,Y,Z (cm), if applicable0, 0, 0
Vertex offset: x, mm0
Vertex offset: y, mm0
Φ (phi), radian0 < Φ < 6.29
η (eta)-1 < η < 1
Pt, GeV0 < Pt < 7

Tracking Efficiency Uncertainty meeting

2021-03-02 10:00
2021-03-02 11:00
America/New York
Tuesday, 2 March 2021
https://bnl.zoomgov.com/j/1607035037?pwd=WDVqaEdwa0RtTEM5a1VvZ24yU2gwdz09, at 15:00 (GMT), duration : 01:00

Tracking Efficiency Uncertainty meeting

2021-02-23 10:00
2021-02-23 11:00
America/New York
Tuesday, 23 February 2021
https://bnl.zoomgov.com/j/1607035037?pwd=WDVqaEdwa0RtTEM5a1VvZ24yU2gwdz09, at 15:00 (GMT), duration : 01:00
TimeTalkPresenter
10:00K->3pi update ( 00:20 ) 1 file

gamma-A in Run-17 AuAu 54 GeV

Speaker : Nicole Lewis ( BNL )


Talk time : 10:20, Duration : 00:20

Update on H4L and He4L binding energy at 3GeV FXT

Speaker : Tianhao Shao


Talk time : 10:00, Duration : 00:20

Short_term_stability_LED

 

Run XXI Ks0 mass and STAR main magnet current

 

Production module assembly

Speaker : Xu Sun ( UIC )


Talk time : 09:30, Duration : 00:10

Mechanical Structure

Speaker : Yi Yang ( NCKU )


Talk time : 09:20, Duration : 00:10

T-board and Inner Signal Cable

Speaker : Maowu Nie, Michael Capotosto ( SDU, BNL )


Talk time : 09:10, Duration : 00:10

Integration

Speaker : Rahul Sharma, Felix Archampong ( BNL )


Talk time : 09:00, Duration : 00:20

Follow-up on action items

Speaker : all


Talk time : 08:30, Duration : 00:15

************* From Feb 22 ************* 

Production Status:
1) Completed: 

T-board and Inner Signal Cable

Speaker : Maowu Nie, Michael Capotosto ( SDU, BNL )


Talk time : 09:10, Duration : 00:10

Integration

Speaker : Rahul Sharma, Felix Archampong ( BNL )


Talk time : 09:00, Duration : 00:20

Follow-up on action items

Speaker : all


Talk time : 08:30, Duration : 00:15

************* From Feb 15 ************* 

Production Status:

STAR Forward Silicon Tracker Meeting

2021-03-01 08:30
America/New York
Monday, 1 March 2021
Zoom meeting ID: 87904302955 Passcode: fSTAR2021, at 13:30 (GMT), duration : 00:00
TimeTalkPresenter
08:30Follow-up on action items ( 00:15 ) 0 filesall
09:00Integration ( 00:20 ) 0 filesRahul Sharma, Felix Archampong (BNL)
09:10T-board and Inner Signal Cable ( 00:10 ) 0 filesMaowu Nie, Michael Capotosto (SDU, BNL)
09:20Mechanical Structure ( 00:10 ) 0 filesYi Yang (NCKU)
09:30Production module assembly ( 00:10 ) 1 fileXu Sun (UIC)

Mechanical Structure

Speaker : Yi Yang ( NCKU )


Talk time : 09:20, Duration : 00:10

Production module assembly

Speaker : Xu Sun ( UIC )


Talk time : 09:30, Duration : 00:10

STAR Forward Silicon Tracker Meeting

2021-02-22 08:30
America/New York
Monday, 22 February 2021
Zoom meeting ID: 87904302955 Passcode: fSTAR2021, at 13:30 (GMT), duration : 00:00
TimeTalkPresenter
08:30Follow-up on action items ( 00:15 ) 0 filesall
09:00Integration ( 00:20 ) 0 filesRahul Sharma, Felix Archampong (BNL)
09:10T-board and Inner Signal Cable ( 00:10 ) 0 filesMaowu Nie, Michael Capotosto (SDU, BNL)
09:20Mechanical Structure ( 00:10 ) 0 filesYi Yang (NCKU)
09:30Production module assembly ( 00:10 ) 2 filesXu Sun (UIC)

JetCorr PWG Data QA: Run-21 AuAu 7.7 GeV

 JetCorr will not be using this dataset, so this is mostly superfluous QA. However, it will be nice to have the codebase ready for the OO run later in the year.