Production module assembly
Updated on Tue, 2020-10-20 21:26. Originally created by yezhenyu on 2020-10-20 21:26.Speaker : Xu Sun ( UIC )
Talk time : 09:30, Duration : 00:10
STAR Forward Silicon Tracker Meeting
Updated on Tue, 2020-10-20 21:25. Originally created by yezhenyu on 2020-10-20 21:25.Zoom meeting ID: 87904302955 Passcode: fSTAR2021, at 12:30 (GMT), duration : 00:00
Time | Talk | Presenter |
---|---|---|
08:30 | Follow-up on action items ( 00:30 ) 0 files | all |
09:00 | Integration ( 00:20 ) 0 files | Rahul Sharma, Felix Archampong (BNL) |
09:10 | Hybrid and T-board ( 00:10 ) 0 files | Maowu Nie, Jianing Dong (SDU) |
09:20 | Mechanical Structure ( 00:10 ) 0 files | Yi Yang (NCKU) |
09:30 | Production module assembly ( 00:10 ) 0 files | Xu Sun (UIC) |
Verkest DNP2020 slides
Updated on Tue, 2020-10-20 18:44. Originally created by vverkest on 2020-10-20 18:44.
Update on Performance of CA Tracker
Updated on Wed, 2020-10-21 10:50 by kehw. Originally created by dongx on 2020-10-20 17:55.Reference
Speaker : Hongwei Ke ( BNL )
Talk time : 11:30, Duration : 00:15
TPC weekly
remote only, at 20:00 (GMT), duration : 00:00
Title: STAR TPC Weekly
Description: Weekly TPC meeting for the STAR Collaboration
Community: STAR
agenda:
- hardware
hardware progress
- software
update on 3He effeciency; Yue Hang
https://drupal.star.bnl.gov/STAR/system/files/he34embedding3rdnew_1.pdf
minutes
TPC meeting Nov 18, 2020
-hardware
Alexei and Nicolai another test round on adding SF4 to P10 at outer sector in clean room. Had to use +65V to get same gain as P10. Still some issues if this is ok. And will do another set of measurements in 2 weeks or so
Also working to get laser system back into shape.
Tim is installing gating grid drivers. Flemming confirmed that David is involved in get the SC for GG up and running. We should contact him for progress.
-software
Presentation by Yue on further check on the 3He, 4He efficiency and issues.
Presentation is linked on meeting web page.
Presented nicely where the consequences show us where there are differences splittracks, 3He vs. protons. There is still no understanding how the change in pedestal should affects stuff.
Discussion on run-19 alignment. Irakli has done a bit more work; he and Yuri are having discussion. Yuri shows some preliminary work documenting the different mass splitting depending on library version and corrections applied.
No meeting on Wed 25 just before thanksgiving.
Xin would like to have an updated report at next S&C meeting (not 25 either)
Phone Dial-in
+1.408.740.7256 (US (San Jose))
+1.888.240.2560 (US Toll Free)
+1.408.317.9253 (US (Primary, San Jose))
Meeting ID: 628 045 566
Direct link: https://bnl.bluejeans.com/628045566
TPC weekly
remote only, at 20:00 (GMT), duration : 00:00
TPC weekly
remote only, at 20:00 (GMT), duration : 00:00
Power cables should be crimped (100' and pigtails) as many are bad. El group looking for help
Gating Grid Drivers will be replacd Tim has to maake nesc fixes, should be installed in about 2 weeks
Repairs of RDO and FEE continuing
AL working on optical parts for laser, installing NMR for Mag field calibration, looking at response with outer sector in clean room
added SF4 gas. Nicolai wll come to BNL again next week?
Preliminary report from Yuri on difference between online and offline cluster
https://drupal.star.bnl.gov/STAR/system/files/FCF_online_offline.pdf
3He effeciency https://drupal.star.bnl.gov/STAR/system/files/he34embedding.pdf
TPC weekly
remote only, at 19:00 (GMT), duration : 00:00
Title: STAR TPC Weekly
Description: Weekly TPC meeting for the STAR Collaboration
Community: STAR
Phone Dial-in
+1.408.740.7256 (US (San Jose))
+1.888.240.2560 (US Toll Free)
+1.408.317.9253 (US (Primary, San Jose))
Meeting ID: 628 045 566
Direct link: https://bnl.bluejeans.com/628045566
TPC weekly
remote only, at 19:00 (GMT), duration : 00:00
Title: STAR TPC Weekly
Description: Weekly TPC meeting for the STAR Collaboration
Community: STAR
Phone Dial-in
+1.408.740.7256 (US (San Jose))
+1.888.240.2560 (US Toll Free)
+1.408.317.9253 (US (Primary, San Jose))
Meeting ID: 628 045 566
Time | Talk | Presenter |
---|---|---|
15:00 | Run-19 Alignment Mistery ( 00:20 ) 0 files | Irakli |
AOB
Updated on Tue, 2020-10-20 17:55. Originally created by dongx on 2020-10-20 16:54.CVS->Git Next Step
Updated on Tue, 2020-10-20 16:52. Originally created by dongx on 2020-10-20 16:52.Reference
Speaker : Dmitri Smirnov, Grigory Nigmatkulov ( BNL, MEPhI )
Talk time : 11:15, Duration : 00:15
Production Status
Updated on Wed, 2020-10-21 10:50 by genevb. Originally created by dongx on 2020-10-20 16:51.Reference
Speaker : Gene Van Buren ( BNL )
Talk time : 11:00, Duration : 00:15
- HPSS:
- A scheduled downtime Oct. 6th-7th
- HPSS interface down Oct.
Ebye corr btw Lam handedness and CME, separate correlations
Updated on Tue, 2020-10-20 16:21. Originally created by fengyich on 2020-10-20 16:21.
die_Run18_27GeV_Vz35cm
Updated on Tue, 2020-10-20 08:56. Originally created by zye20 on 2020-10-20 08:56.Talk time : 09:00, Duration : 00:20
https://drupal.star.bnl.gov/STAR/system/files/Die_Vz30cm_ZaochenYe_2020_1020.pdf
Feedback from S&C meeting on merging [stage: comparison]
Updated on Tue, 2020-10-20 08:21. Originally created by iraklic on 2020-10-20 08:21.AOB
Updated on Tue, 2020-10-20 08:08. Originally created by jwebb on 2020-10-20 08:08.Talk time : 11:00, Duration : 00:05
FWD software update
Updated on Tue, 2020-10-20 07:28. Originally created by jdb on 2020-10-20 07:28.Speaker : Daniel Brandenburg
Talk time : 08:50, Duration : 00:20
FCS at Run21 AuAu7.7
Updated on Tue, 2020-10-20 06:56. Originally created by akio on 2020-10-20 06:56.Speaker : Akio
Talk time : 08:30, Duration : 00:20