computing
Shift Accounting
Updated on Wed, 2019-10-23 13:37. Originally created by jeromel on 2015-11-24 14:11. Under:This page will now hold the shift accounting pages. They complement the Shift Sign-up process by documenting it.
Run XVI
Updated on Thu, 2016-01-14 09:20 by testadmin. Originally created by jeromel on 2015-11-24 09:48. Under:This page will contain feedback related to the preparation of the online setup.
Notes
Run XV
Updated on Tue, 2015-11-24 09:49 by testadmin. Originally created by jeromel on 2015-11-24 09:45. Under:Run 15 was preapred essentiallydiscussing with indviduals and a comprehensive page not maintained.
Other databases created for the 2015 reconstructions
Updated on Fri, 2015-11-20 17:11. Originally created by yipkin on 2015-10-27 09:06. Under:DCS Interface & Behaviors
Updated on Mon, 2015-08-10 15:22. Originally created by dmitry on 2015-08-10 13:23. Under:DCS HW Interface and Operations
pp2ppRPpositions (STAR offline database) corrections
Updated on Tue, 2015-08-11 10:41. Originally created by yipkin on 2015-08-07 09:29. Under: Originally, this is mainly to correct for the malfunctioning LVDT readings of the E1D between Mar. 18 and Apr.
2015
Updated on Tue, 2015-06-30 16:02. Originally created by jeromel on 2015-06-30 16:02. Under:Budget initially thought to be allocated for the RCF for equipment growth and refresh was not provided.
Introduction to STAR software and makers
Updated on Fri, 2015-06-19 11:49 by testadmin. Originally created by lkosarz on 2015-06-13 14:54. Under: A good reading for a newcomer to STAR is the presentation by Leszek Kosarzewski:
KFParticle Vertex Finder
Updated on Thu, 2016-07-21 16:05. Originally created by smirnovd on 2015-06-08 11:46. Under:Summary
J. Lauret, V. Perevoztchikov, D. Smirnov, G. Van Buren, J. C. Webb
Calibration Schedules
Updated on Sun, 2015-06-28 22:36. Originally created by genevb on 2015-05-15 16:20. Under: The listed dates should be considered deadlines for production readiness.
Run 15 pAu200 preliminary 2
Updated on Mon, 2015-05-11 16:29. Originally created by genevb on 2015-05-08 14:31. Under: The first preliminary calibration, using HFT only, found (x0,y0) = (0.096 ± 0.009, -0.272 ± 0.009), using a »
Run 15 pp200 preliminary 2
Updated on Mon, 2015-05-11 16:38. Originally created by genevb on 2015-05-08 14:31. Under: The first preliminary calibration, using HFT only, found (x0,y0) = (0.01, -0.24), using a »
Run 15 pAu200
Updated on Mon, 2015-05-11 16:11. Originally created by genevb on 2015-05-08 10:38. Under: Preliminary calibration (no tilt, from HFT):
- Xin Dong determined the position of the beam spot at z=0 in global coordinates (see the last result on this page: VPDMB purity check and vertex position check for pAu 200 GeV)
Run 15 pp200
Updated on Mon, 2015-05-11 16:12. Originally created by genevb on 2015-05-08 10:36. Under: Preliminary calibration (no tilt, from HFT):
- Xin Dong determined the position of the beam spot at z=0 with respect to the center of the PXL (see the "all triggers" result of t
Run 12 CuAu
Updated on Wed, 2015-04-01 14:00. Originally created by genevb on 2015-04-01 10:45. Under: The TPC drift velocities were re-calibrated using the most recent TPC alignment.
Run 12 CuAu200
Updated on Tue, 2015-02-17 14:41. Originally created by genevb on 2015-02-06 15:48. Under: Regarding the P14ia Preview Production of Run 12 CuAu200 from early 2014:
Calibration topics by dataset
Updated on Fri, 2015-02-06 15:02. Originally created by genevb on 2015-02-06 15:02. Under: Focus here will be on topics of note by dataset
2015
Updated on Thu, 2015-12-10 14:15. Originally created by didenko on 2015-01-08 13:31. Under:STAR SOFTWARE NEWS December 10, 2015 --------------------- The present release assignment: SL09g (SL09g_4) ROOT_LEVEL 5.22.00 run 2009 pp 500GeV data production