SN0322 : Time Projection Chamber - Assembly and Test

Author(s):R. Wells
Date:Jan. 14, 1998
File(s):sn0322.ps.gz
Abstract:This note details the stuctural analysis of the TPC cleanroom enclosures. Both wind and fixed loads are considered.
Keywords:
Category: