SN0371 : Time Projection Chamber - Assembly and Test Installation Beam Suspension Cable Insertion

Author(s):R. Wells
Date:Oct. 15, 1998
File(s):sn0371.pdf| sn0371.ps.gz
Abstract:Calculation of the required cable tension to support the TPC installation beam during insertion into the RHIC-STAR Magnet.
Keywords:
Category: