Weekly meeting (Jul. 31)

- David: FPS and FPOST good run list and IV curve status
  Status of the IV curve analysis and information about how good runs were chosen for the FPS and FPOST in Run 17.

- Chong: RUN15 FMS-FPS alignment update

- Minghui: Status of Simulations