fisyak's blog - Run XIII pp 500p2 (days 127-161) dE/dx. The first look. - August 8., 2014
- Run XIII pp 500p1 (days 074-126) dE/dx - January 15., 2014
- Run XII CuAu200 dE/dx Calibration - May 12., 2015
- ROOT6 in TFG - October 29., 2020
- Revisiting drift velocities for Run XIX - July 24., 2020
- Revision of STAR TPC dE/dx model (rev2) - January 4., 2023
- Revision of STAR TPC dE/dx model - July 20., 2022
- Revision (i)TPC measurement systematics and errors with TpcRS - September 13., 2023
- Results of the TPC survey 01/08/2024 - January 11., 2024
- Results of dE/dx test production for Run X. - October 26., 2010
- Results of 7p7GeV 2021 dE/dx calibration using TFG release - May 25., 2022
- Reconstruction of open charm in STAR with KF Particle Finder - October 31., 2017
- Recheck dE/dx with SL23c calibration samples for 14p5GeV and 19GeV 2019 - June 1., 2023
- Proposal to use dN/dx for coming 2016 AuAu200 production - September 22., 2016
- Problems with dE/dx pulls in P21ib_calib2 and P21ic production - August 18., 2021
- ppbar M2 for 9p2GeV_2020[a-c]_P23ai - February 9., 2023
- Planarity of the membrane (cont.) - April 18., 2014
- Pico DST issues - July 5., 2018
- Performance comparison of Fast Offline and Express Production - February 17., 2021
- Outer to Inner sector alignment using Y2011 Cosmic data - August 2., 2011
- Optimization compiler options for STAR offline software - March 30., 2016
- OO 200 GeV 2021 RF vs FF - June 9., 2021
- No. of primary track versus HFT hit pattern for AuAu200 low luminosity run 2014 - February 23., 2015
- Nikolai Smirnov, TPC Grid leak, 2005 - April 8., 2015
- Next Update on neutron fluxes @STAR - November 29., 2012
|