Production Priorities Spring 2017
Production Priorities - Spring 2017
Proposed production priorities
- Spring 2017 - see Production Priorities Spring 2017
Past production priorities
- Summer/Fall 2016 - see Production Priorities Summer2016
- Fall Winter 2015 - see Production Priorities Fall 2015
PWG Feedback:
BulkCorr- production: Run-16 d+Au at lower energies (20, 39, 64)GeV
- test sample request:
- test Sti/StiCA/StiHR at 19.6GeV
- motivation: future tracking productions and potential reproduction BES-1
- more details at this link
Heavy Flavor
- details: http://www.star.bnl.gov/HyperNews-star/protected/get/starpwgc/4289/1/1/1/1.html
- physics production requests/priorities:
- Run16 AuAu200 st_sst
- Run16 dAu200: st_physics and st_mtd
- Run16 AuAu200 st_mtd
- Run15 pp/pA200 st_ssdmb
- Run12 CuAu200
- test productions:
- Run-14 AuAu200 test production on Sti vs. StiCA
JetCorr
- physics production:
- http://www.star.bnl.gov/HyperNews-star/protected/get/starpwgc/4299/1.html
- Run 16 l2gamma stream
- test production:
- currently preparing to check Run-14 regarding effect of including HFT.
- Pending the outcome, may need additional testing of the HT2/3 data.
LFS/UPC
- no input
Spin
- details: http://www.star.bnl.gov/HyperNews-star/protected/get/starpwgc/4289/1/1/1.html
- physics production:
- reproduction of P16ig st_W
- test production
- fast production Run-17 st_W stream (through period coordinator)
- Run-17 calibration production of FMS (through software coodinator)
S&C Considerations:
- for production status/plans/readiness: slides 7-10 on Jerome's slides
- more info on picoDST readiness, resources (disk/cpu), track finder options
- BulkCorr: is the FMS included in the picoDST?
Groups:
- geurts's blog
- Login or register to post comments