East Sector 1
I noticed that Sector 1 on the East side has had some strange behavior (way too many details are at: drupal.star.bnl.gov/STAR/blog/rjreed/results-2021-epd-install) and it was not entirely clear whether it was the result of a poor optical connection, an electronics issue, damage to the fiber bundle or scintillator.
The piece of evidence is that the bias settings to get a signal out are higher than the other channels, especially on the odd side.
Figure 1: Bias voltage settings 2/24/2021. Some slight adjustments have been made to a few tiles based on results but is otherwise the same.
First - the dark current didn't change between Run 20 and Run 21:
Figure 2: Dark current tile by tile for the east side. Note - these were all done at the light leak bias voltage.
Figure 3: Bias scan for the first 3 tiles of East PP1 from 2021. Even at 61V there isn't much signal.
In addition to the weak signal on the first 3 tiles, tile 5 also has a strange look:
Figure 4: East tile 5. Not only does sector 1 look weak, but the shape of the spectrum is strange.
Looking at the Bias Scan from 2020 (full giant pdf is at: drupal.star.bnl.gov/STAR/system/files/BiasScan_2020.pdf )
Figure 5: Bias scan of these 3 tiles from 2020. It looks much better here.
Figure 6: Bias voltages 2021 vs 2020.
In Figure 6 I reran the code so that I was comparing apples to apples (I think 2020 might have had a different ADC value to be aimed for). Other than 2 tiles, all channels wanted to be at a higher bias setting.
- rjreed's blog
- Login or register to post comments