EPD Calibration for 19.6 GeV Run 19, BESII
Updated on Fri, 2019-11-15 12:09. Originally created by skk317 on 2019-10-25 13:49.
All fits have been done for the Run 19 (2019), 19.6 GeV collision energy EPD ADC spectra (days 57-93). For a detailed look at how calibrations are performed, please see this post.
Please see attached slides and plots for further details.
Attached files are as follows:
Kagamaster_11_15_2019.pdf - This is the presentation on the current state of 19.6 GeV calibrations.
MIPFits01*.pdf - These are the fit results per tile over all days.
MIPFits02*.pdf - These are the supersector goodness of fit plots for the ranges specified.
NmipTotal.txt - All of the calibration values.
FindNmip.txt - Current macro for fitting the ADC spectra histograms.
FindNmipTest.txt - New macro I'm working on to make fitting less time intensive.
FindNmipFix.txt - New macro for refitting errant tiles.
Please see attached slides and plots for further details.
Attached files are as follows:
Kagamaster_11_15_2019.pdf - This is the presentation on the current state of 19.6 GeV calibrations.
MIPFits01*.pdf - These are the fit results per tile over all days.
MIPFits02*.pdf - These are the supersector goodness of fit plots for the ranges specified.
NmipTotal.txt - All of the calibration values.
FindNmip.txt - Current macro for fitting the ADC spectra histograms.
FindNmipTest.txt - New macro I'm working on to make fitting less time intensive.
FindNmipFix.txt - New macro for refitting errant tiles.
»
- skk317's blog
- Login or register to post comments