xlchen's blog - Signal (prompt and non-promt) and background distribution for sPhenix , update - November 18., 2016
- Signal (prompt and non-promt) and background distribution for sPhenix - November 15., 2016
- Analysis meeting in LBNL -- 11/10/2016 - 11/12/2016 - November 11., 2016
- D0 analysis summary - November 7., 2016
- sPhenix_BtoD_simu - November 2., 2016
- Nuclear Science Division Directors Review in Oct. 26-28, 2016. - October 19., 2016
- Kaon TOF match efficiency - October 18., 2016
- Run11 D0 foreground check - October 6., 2016
- Hijing+D0 simulation sample and check the tracking effect on the D0 mass spectrum quantitatively - September 19., 2016
- B to D analysis - August 28., 2016
- QM-2017 - August 27., 2016
- collaboration meeting in OSU: D0 Tpc analysis and B to D analysis - August 15., 2016
- D0 TPC re-Run - August 15., 2016
- B feed-down and B to D pre study 2-----using pT spectra from FONLL as weight - August 1., 2016
- B to D pre study using fast simulation - July 27., 2016
- Centrality definition for Run14 AuAu 200GeV, P16id - July 25., 2016
- D0 discuss - July 13., 2016
- D0 Topology cut QA - July 11., 2016
- D0 with HFT - June 20., 2016
- D0 reco - March 28., 2016
- k/pi PID for D0 Reconstruction - March 14., 2016
- Electron PID - January 20., 2016
|