Sort by:[Date]

D0_RAA_draft

 

AnaNote_D0_Isobar

 

Checking EPD QTC -> DSM

Since we moved many of the QTCs around, we need to move the QT adapter cards in the back so that the QTCs are connected to the DSMs.  All East QTCs should go to EP001, all west QTCs should go to

Directed Flow of 4ΛH and 3ΛH in √sNN = 3.5 GeV Au+Au Collisions

 

Preliminary Plots for Energy-Energy Correlator Measurement in p+p Run12

 

Preliminary Plots for Energy-Energy Correlator Measurement in p+p Run12

 

Preliminary Plots for Energy-Energy Correlator Measurement in p+p Run12

 

Preliminary Plots for Energy-Energy Correlator Measurement in p+p Run12

 

Preliminary request for HP23 - Final version

 

Isobar Jet V2 Preliminary Figures