Sort by:[Date]

DoE site visit 2021

 

FST survey

 The FST survey ahs been carried out by te BNL CA-D survey group. I have looked in detail of much of this.
This blog contains some information of this.

FST Slow Control Documents

 

PID with TOF-Spin PWG Slides

 Presented date: 10/13/2021
 Towards finalizing the large systematic uncertainty coming from the PID estimated using TPC only, I have now applied TPC and TOF together.

analysis note

 

GPC299 Cross Check

 

dE/dx calibration of Run XIX and XX fixed Target (progress report)

 

3GeV_Proton_Cumulants_Long_Paper_Webpage

Global polarization at 19.6 GeV

Δdv1odd/dy for pions, kaons and protons in Au+Au collisions at 27GeV