Sort by:[Date]

Run 26083019 TPC, fake nits around some anodes

 

preliminary-request-UUchi422-QM2025

 

xyc_2025_3_24

 

Cross Check 25.3.24

 

Cross Check for 3p9 GeV.

 

FCV PWG preliminary request of He4L and He5L v1 at 3.0 GeV, Mar. 23

 

The preliminary results of Xi and Lambda production at 7.7 GeV and Omega production at 9.2, 11.5 GeV in Au+Au collisions(detail)

 cut81 means -1.50<y-1.25, cut82 means -1.25<y<-1.00 ......cut92 means 1.25<y<1.50

iTPC RDO geometry

Summary of information about iTPC RDO
A.Lebedev, 03/12/2025

Old inner sector   44x17 cm2  820 g

FST Meeting on 03/24/2025

Start: 2025-03-24 9:00 am

 
Timezone: America/New York
 
Meeting Agenda:

Preliminary request for EESI in peripheral collisions