Sort by:[Date]

Draft Slides for DIS 2015

 

Check Online Threshold

1>Data Set
The runs are:
(Nside N, Pside N, NConstant, PConstant)
16107010      3_3_9_5  

FMS Calibration Day080 and Day108

 The best calibration for Day 80 are found here:
1) html file

SST workshop @ BNL

DIS 2015 Talk

 

DIS 2015 Talk on Weak Boson Production (A_N and unpol. xsec ratios)

DIS 2015 W cross section ratio Preliminary Plots

IST

 

NPE in Run14 Au+Au 200 GeV Meeting Minutes by Zhenyu - 2015/04/17

1. Data

J/ψ Invariant mass vs dphi vs pT