Calibration Schedules

Under:
The listed dates should be considered deadlines for production readiness. Known issues with any of the calibrations by the deadline should be well-documented by the subsystems.
  •  Run 15: projected STAR physics operations end date of 2015-06-19 (CAD) 2015-06-22
    1. pp200
      • tracking: 2015-07-22
      • all: 2015-08-22
    2. pAu200
      • tracking: 2015-08-22
      • all: 2015-09-05
    3. pAl200
      • tracking: 2015-09-22
      • all: 2015-10-06