psi(2S) backup1

 

Preliminary_reuslt_Yiding_V4

 

Editorial Board Meeting, August 2023

2023-08-18 09:00
2023-08-18 12:00
America/New York
Friday, 18 August 2023
https://lbnl.zoom.us/j/99981267001?pwd=Q05nbjc3ZlgvR21TTzFpK2Jod2pJdz09, at 13:00 (GMT), duration : 03:00
 
  1. Policy reminder   
    • Dedicated mailing list (https://lists.bnl.gov/mailman/listinfo/star-gpc-XXX-l) starting from GPC #326  
      • Please use this mailing list for all GPC discussions, which are archived automatically.
      • Only PAs and GPC members are subscribed. Conveners and PAC are not. 
    • Author list and acknowledgement
      • "The STAR Collaboration" is used as the author at submission. The actual author list will be determined and inserted after the paper is accepted
      • Acknowledgement will be prepared and sent to PA by PAC when a paper is ready for collaboration reivew
    • Timeline  
      • Collaboration review - 2 weeks
      • Send responses to collaboration review to starpapers-l list - 1 week
      • Announce paper to RHIC - 1 week
      • Send responses to referee reports to starpapers-l list - wait 3 days (minor revision) or 1 week (major revision) to resubmit
      • Once accepted, paper with author list determined by PAC will be send to starpapers-l list, wait 3 days to send journal
    • HepData procedure  
      • Before the paper is announced to RHIC, prepare data tables  (PA)
      • After a paper is submitted and a HEPData entry is created, upload and review data tables (PA and GPC chair)
      • During referee process, update and review data tables if needed  (PA and GPC chair)
      • After a paper is published, make the data tables public (Frank)
    • Other remarks  
      • Remind PA to forward communications with journal to starpapers-l list, e.g. paper submitted, referee report, paper accepted, paper published. 
         
  2. Status overview  
    • See www.star.bnl.gov/protected/common/GPCs/gpc-committees.xml
    • Since last meeting (24/03/2023):   
      • 11 (3) new GPCs formed: #351-361
      • 9 (4) sent to collaboration reviews: #339, #343, #346, #348, #349, #350, #351, #354, #355
      • 7 (5) submitted papers: #332, #333, #335, #337, #340, #342, #345
      • 9 (12) published papers: #334, #330, #299, #227, #256, #341, #345, #344, #340
      • 19 papers published so far in 2023!
         
  3. Review & feedback on list of active GPCs  (STATUS TABLE)  
    • See www.star.bnl.gov/protected/common/GPCs/gpc-active.xml
    • Currently 31 (28) active GPC
      • >12 months in GPC w/o Collaboration Review -- 4 (4): #219, #242, #292, #307
      • >6 months in GPC w/o Collaboration Review -- 0 (3)
      • >3 months after Collaboration Review w/o Journal Submission -- 4 (3): #286, #338, #348, #349 
      • >6 months after Journal Submission -- 2 (2): #268, #336
PWGC  

1. PWGC preview over 6 months ago but not in GPC
2. Agenda

Centrality determination for 7.7 GeV FXT Run 20

 

draft of ISMD2023 talk

 

manudiff

 

replies

 

Isobar CME baseline, preliminary request for QM2023

Manuscript

 

2023-08-15 centrality meeting

 

S&C management meeting

2023-09-06 12:00
2023-09-06 13:00
America/New York
Wednesday, 6 September 2023
N/A, at 16:00 (GMT), duration : 01:00

S&C management meeting

2023-08-23 12:00
2023-08-23 13:00
America/New York
Wednesday, 23 August 2023
https://riceuniversity.zoom.us/j/99943071327?pwd=RHlaamc0bHJpS29tLzdpb2tDcWMyZz09, at 16:00 (GMT), duration : 01:00
 
  • updates from SDCC
  • Physics Production
    • calibration updates
    • production updates
    • embedding updates
  • FWD-test Run22 production update
  • AOB

Zoom Link: https://riceuniversity.zoom.us/j/99943071327?pwd=RHlaamc0bHJpS29tLzdpb2tDcWMyZz09

S&C management meeting

2023-08-30 12:00
2023-08-30 13:00
America/New York
Wednesday, 30 August 2023
N/A, at 16:00 (GMT), duration : 01:00

S&C management meeting

2023-08-16 12:00
2023-08-16 13:00
America/New York
Wednesday, 16 August 2023
N/A, at 16:00 (GMT), duration : 01:00
  • updates from SDCC
  • Physics Production
    • calibration updates
    • production updates
    • embedding updates
  • spack/software installation management - next steps
  • ROOT6
  • FWD software status
  • AOB
Zoom Link: https://riceuniversity.zoom.us/j/99943071327?pwd=RHlaamc0bHJpS29tLzdpb2tDcWMyZz09
TimeTalkPresenter
19:00embedding status ( 00:20 ) 1 fileXianglei Zhu

H3L FXT 3.5 GeV systematic uncertainty

 

Preliminary results: run15 pion-tagged jet ALL

Preliminary results of run15 double spin asymmetry of the pion-tagged jets. This results are going to shown at SPIN2023.

Data set
pp200long2_2015

Preliminary results: run15 Lambda and Kshort ALL

Preliminary results of run15 double spin asymmetry of the in-jet Lambda hyperon and Kshort meson. This results are going to shown at SPIN2023.

Preliminary result V3

 

Preliminary result V3

 

Preliminary request for QM