Software and Computing Meeting

2014-12-17 12:00
2014-12-17 13:00
America/New York
Wednesday, 17 December 2014
1-189, SRN, at 17:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00Au-Au 15/200 GeV TPC SC and GL Calibration Update ( 00:20 ) 1 fileMatthew Posik (Temple)
12:20Calibration updates ( 00:15 ) 0 filesGene V. Buren (BNL)
12:35Sti/HFT status ( 00:20 ) 2 filesJason Webb (BNL)
12:55AOB ( 00:05 ) 0 filesAll (All)

Dilepton Trigger Run 14 (Bill's slides from 05/03/2014)


Talk time : 10:55, Duration : 00:20

 

exclusivity cut

Speaker : Leszek Adamczyk (AGH-UST)


Talk time : 10:50, Duration : 00:05

Calibration status update for Run 14 AuAu datasets

  •  14.6 GeV AuAu

SSD Geometry


Talk time : 10:00, Duration : 00:20

 

iTPC insertion tool

2014-12-17 12:30
America/New York
Wednesday, 17 December 2014
2-78 at BNL, at 17:30 (GMT), duration : 00:00
Insertion tooling has been completed and arrived at BNL  5/12/2017

A few pictures


First attempts to unload



second and successful attempt


tooling out of car



-----------------------------------------------------------------
old meeting: notes   12/17/2014

First review of concepts of iTPC insertion tooling


Agenda:

1) Discussion about the design of the iTPC sector insertion tool for STAR - R.Sharma - 25 mins
2) Analysis of the sector insertion tool and comparing the final deflection numbers with clearances -  R.Sharma - 25 mins
3) Clean room environment requirements - R. Brown - 25 mins
4) Scaffolding requirements - R. Brown - 25 mins
5) Schedule - R. Brown - 10 mins
6) Break - 10 mins
7) Reviewer Questions, Comments and Closeup - 60 mins



Meeting minutes will be taken by Flemming. We will start at 12:30pm EST and we will be done by 3:30pm EST. Please try to go over the presentation file in advance. I appreciate everyone making time for this review. 


Presentation by Rahul & Ralph
Notes from meeting (FV)

Away-side jet correlations 1216 2014

 

Weak boson A_N Analysis Note

Analysis Note

Trigger for run 15

Speaker : Igor Alekseev ( ITEP )


Talk time : 10:30, Duration : 00:20

A revised version of trigger presentation.

Run-11 Transverse Jets: Slides for PWGC Preview

 

Run 9 200GeV Dijet Cross Section: Integrated Luminosity Systematic

Hopefully the last discussion on how to quantify the systematic error associated with the extraction of the integrated luminosity ...

Run12 Calibration: New Fits

 

2011+2012 Collins Figure for Spin White Paper

Posted below in Fig. 1 and attached at the bottom of the blog is a proposed figure for the RHIC Spin White Paper.

EMC Status Tables for Run 14

 

PWGC Meeting

2014-12-16 11:00
2014-12-16 13:00
America/New York

--- Agenda ---

1) Run-14 production status

FMS Simulation Issues

 The problem that we notices in last weeks FMS meeting was that there appeared to be a strange cutoff in the per-tower simulation at 50 GeV.

2012 - Relative Luminosity Plots

IFF paper drafts

 

Talk STAR Conveners Meeting, Dec. 16th, 2014

IST Sti Geometry

Version 1: Simplified