Comparison of 08 and 09 L2 jet Algo

L2 Jet Algo Study

 

Visit to Workshops/Survey Lab


Talk time : 09:30, Duration : 00:20

2008.12.11 Run 8 EEMC QA (presentation for Spin PWG)

Ilya Selyuzhenkov December 11, 2008

Run 9, preparation meeting #6

2008-12-05 14:00
2008-12-05 15:00
Etc/GMT-5
Friday, 5 December 2008
1-189, HighSpeed conference bridge, at 19:00 (GMT), duration : 01:00
Meeting is locked (you cannot add new talks anymore)

This meeting was scheduled at an un-usual time slot (due to some local BNL scheduling of additional safety related meetings).

 

STAR Management Meeting

2008-12-10 10:00
2008-12-10 11:00
Etc/GMT-7
Wednesday, 10 December 2008
BNL, 50-I-189, at 15:00 (GMT), duration : 01:00
Meeting is locked (you cannot add new talks anymore)

Conference Phone Number: 510 486 7333

   Time:  10 - 11 am EDT

 * --===================================--*

  Agenda:

    1)    Shift sign up - Olga 
    2)   
QM09 abstracts preparation - Bedanga
    3)    HF new convener candidate(s) - Nu

    4)    India trip - Bernd/Zhangbu/Nu

    5)    AoB


* --===================================--*

    Brief Summary:

   1) Attending: Helen, Olga, Bedanga, Nu. BNL was having a E. Drill. Bernd was on travel.

   2) QM09 abstracts:  (1) HBT abstract: Nu call Mike and decide, today; (2) SVT data: wait till Dec. 13th - Nu; (3) Jets: 3 abstracts; (4) v1: poster / v2: combine Shusu's and Navneet's abstracts, provided BC group support. The discuss at BC will happen today, Dec. 10th.

  3) Shift:  (a) shift certification: Olga -> Tim. (Nu) (b) P.C: announcement -  Nu;  (c) earlier shifts Before Feb. 7th)

  4) Three conveners for HQ PWG: Yes.   

  Notes:

    1) QM09 abstract deadline: Dec. 15th

    2) Steve meets with STAR for Parity Violation analysis: Dec 17, 2-4pm, physics, 2-160. Jack, Carl, Jamie, Sergei, Nu,...

    3) BES meeting: Dec. 17-18 at BNL: summarise goals and next steps in BES

    4) CBM/RHIC meeting: March 9-12, 2009, GSI

    5) STAR Collaboration meeting: March 23-27, 2009, BNL

    6) STAR Regional meeting: May 6-9, 2009, Pusan, Korea

STAR Management Meeting

2008-12-10 10:00
2008-12-10 11:00
Etc/GMT-7
Wednesday, 10 December 2008
BNL, 50-I-189, at 15:00 (GMT), duration : 01:00

Conference Phone Number: 510 486 7333

   Time:  10 - 11 am EDT

 * --===================================--*

  Agenda:

    1)    Shift sign up -  Olga
    2)    QM09 abstract - Bedanga
    3)    HF new convener candidate(s)  - Nu
    4)    India trip - Bernd/Zhangbu/Nu

    5)    AoB


* --===================================--*

    Brief Summary:

   1) Attending:

 

    Notes:

    1) QM09 abstract deadline: Dec. 15th

    2) Steve meet with STAR on Parity Violation analysis: Dec. 17, 2-4pm, Physics 2-160. Jack, Carl, Jamie, Nu

    3) BES meeting: Dec. 17-18 at BNL: summarise goals and next steps in BES

STAR Management Meeting

2008-12-10 10:00
2008-12-10 11:00
Etc/GMT-7
Wednesday, 10 December 2008
BNL, 50-I-189, at 15:00 (GMT), duration : 01:00

Conference Phone Number: 510 486 7333

   Time:  10 - 11 am EDT

 * --===================================--*

  Agenda:

    1)    Shift sign up - Olga
    2)    QM09 abstract - Bedanga
    3)    HF new convener candidate(s) - Nu
    4)    India trip - Bernd/Zhangbu/Nu

    5)    AoB


* --===================================--*

    Brief Summary:

   1) Attending:

   2)

 

    Notes:

    1) QM09 abstract deadline: Dec. 15th

    2) Steve meet with STAR on Parity violation analysis, Dec. 17, 2-4 pm, Physics, 2-160: Jack, Carl, Jamie, Sergei, Nu ...

    3) BES meeting: Dec. 17-18 at BNL: summarise goals and next steps in BES

    4) CBM/RHIC meeting: March 9-12th, 2009, GSI

    5) STAR Collaboration meeting: March 23-27th, 2009, BNL

    6) STAR Regional meeting: May 6-9th, 2009, Pusan University, Korea

 

2008.12.09 pp Run 8 vs. Run 6 shower shapes

Ilya Selyuzhenkov December 09, 2008

2008.12.09 pp Run 8 vs. Run 6 SMD shower shapes

Ilya Selyuzhenkov December 09, 2008

2008.12.09 pp Run 8 vs. Run 6 SMD shower shapes

Ilya Selyuzhenkov December 09, 2008

2008.12.09 pp Run 8 vs. Run 6 SMD shower shapes

Ilya Selyuzhenkov December 09, 2008

2008.12.09 pp Run 8 vs. Run 6 SMD shower shapes

Ilya Selyuzhenkov December 09, 2008

2008.12.09 pp Run 8 vs. Run 6 SMD shower shapes

Ilya Selyuzhenkov December 09, 2008

Results-II

Speaker : Jonathan/Jim


Talk time : 15:00, Duration : 00:30

Workshop


Talk time : 14:00, Duration : 04:00

2005 Inclusive Jet pT Shifts and Trigger/Reconstuction Bias TAKE 3

 

Data Driven Gamma Filtered PYTHIA in Pion Analysis

Invariant mass plots are shown with and without shower shape substitution being applied with Data Driven Maker (thanks Ilya).

Eemc Slow vs Fast Simulator

 

Quick and dirty BSMD saturation simulation

Following some discussion in the EMC group on BSMD gain settings, I wanted to see what information is stored in the side strips even if the central strips in an SMD get saturated.

Combined QM09 Abstract

Here is the combined QM09 Abstract for Shingo and myself.

Comments and suggestions are welcome.